Laserfiche WebLink
$35,000 and over/job 20 points <br /> Increase in the local real estate tax base <br /> >$500,000 20 points <br /> $250,000 to $500,000 15 points <br /> <$250,000 10 points <br /> Immediacy of Impact <br /> *20 points awarded if project will begin within 6 months <br /> Subtotal Section 3 (maxim* 320 270 points) <br /> *minimum of 60 points must come from this section in order for project to be considered <br /> 4. Wage Level of new jobs created Points <br /> Minimum hourly wage of jobs created/retained: <br /> Over$21/ hour 5 points <br /> $18-21 / hour 4 p oints 4' <br /> .�� <br /> $14-17 / hour points <br /> $11-13 / hour 2 poi <br /> Below$11/ hour application qualifie G <br /> � x <br /> 5. Project size: 1M' <br /> The project will result it itffig, cons on of -.4...z7„, square feet. <br /> ,.T <br /> 80,000+ 50 . gr'ts <br /> 65,000+ 40 points <br /> 50,000+ 30 points <br /> ,000+ <br /> 20 points <br /> � <br /> 25,00;6+ 10 point <br /> qr <br /> ,f <br /> Subtotal Sections 4-5(maximum 55 points) <br /> Sub-Total Points: of a possible 465 points. <br /> Blighted Properties Forgivable Commercial/Industrial Loan Fund Application Page 16 of 16 <br /> DRAFT <br />