My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.1. SR 11-02-2015
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2015
>
11-02-2015
>
8.1. SR 11-02-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2015 2:20:06 PM
Creation date
10/29/2015 9:36:09 AM
Metadata
Fields
Template:
City Government
type
SR
date
11/2/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(06) Sampling and Analysis Plan. The Sampling and Analysis Plan, which <br /> describes the sampling frequency, parameters, protocols and reporting frequency <br /> for landfill gas, leachate, leachate piezometers, leachate lysimeters, residential <br /> wells and groundwater monitoring wells shall be assessed annually to reflect <br /> changes in the monitoring systems. The Plan shall yield adequate information for <br /> assessing the effectiveness of the landfill gas control system in decreasing VOC <br /> contaminants in the groundwater. The proposed compliance boundary within the <br /> Plan is not approved because it incorporates City property inside the compliance <br /> boundary. The compliance boundary will be limited to the Landfill Property. <br /> Corrective actions (potentially associated with contaminant migration) on City <br /> property, which potentially limit the use of City property, are not allowed. <br /> (07) Annual Operating Report. An Annual Operating Report shall be submitted <br /> with the following supplemental items. <br /> (a) Annual Waste Disposal Volume. <br /> (b) Schedule of construction activities for the forthcoming year. <br /> (c) Type and Quantity of Material Disposed. <br /> (d) Remaining permitted capacity <br /> (e) Updated, full-size, contour map which indicates the elevations of <br /> all fill areas <br /> (f) Assessment of the Financial Assurances Plan. <br /> (g) Evaluation of the Water Monitoring System and a proposal for <br /> continued sampling and analysis. <br /> (h) Detailed evaluation of all water quality results by means of tables <br /> and graphs. <br /> (i) A groundwater contour map based on the previous years' <br /> groundwater level data. <br /> (j) Annually assess the effectiveness of active landfill gas control <br /> operations based on the results of groundwater and landfill gas <br /> monitoring and incorporate the evaluation in the MPCA Annual <br /> Report for the landfill. <br /> (k) The Annual Operating Report must include a full-sized <br /> engineering plan to fully illustrate all facility features reviewed in <br /> the annual report (landfill gas probes, monitoring wells, gas <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.