My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.2 PCSR 10-27-2015
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2015
>
10-27-2015
>
4.2 PCSR 10-27-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2015 12:26:12 PM
Creation date
10/23/2015 12:24:10 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
10/27/2015
case
CU 15-17
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
staff. Building permits and inspections are required regardless of the Commission's <br /> recommendation. <br /> In reviewing the standards for issuance of a CUP,it does not appear the proposed use satisfies items two, <br /> three, and seven. <br /> If denial of such a permit should occur,it shall accompany recommendations or determinations by <br /> findings or a report stating how the proposed use does not comply with the standards set forth in Section <br /> 30-654. <br /> Financial Impact <br /> None <br /> Attachments <br /> • Location Map <br /> • Applicants Narratives <br /> • Site Plan <br /> • Floor Plan <br /> N:\Departments\Community Development\Planning\Case Files\CUP\CU 15-17 Elk River Lodges\CU 15-17 sr PC ER Lodge 10-27-2015-f.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.