Laserfiche WebLink
1 <br /> 1 <br /> �i <br /> Elk River <br /> Municipal Utilities UTILITIES COMMISSION MEETING <br /> TO: FROM: <br /> Elk River Municipal Utilities Commission Mike O'Neill—Technical Services Superintendent <br /> John Dietz—Chair <br /> Al Nadeau—Vice-Chair <br /> Daryl Thompson-Trustee <br /> MEETING DATE: AGENDA ITEM NUMBER: <br /> October 13th,2015 6.1d <br /> SUBJECT: <br /> Staff Update <br /> DISCUSSION: <br /> • The Locating department had a total of 360 locate tickets in September; three of them being <br /> emergency tickets, four cancellations, 13 meetings, 311 normal tickets and 25 updated <br /> tickets. <br /> • In September,the Security Systems Department had a total of 107 phone contacts, 11 <br /> systems quoted, seven system sales made, seven installs completed, 28 service calls and 11 <br /> personal visits. <br /> • Electric Technicians continue with the meter reading,power bill, substation checks, hanging <br /> red-tags,meter read-outs, dealing with meter and off-peak issues, as well as delivering and <br /> installing new meters to commercial customers. They continue to change out the three phase <br /> meters with meters that will be read by radio. Preparations have begun for the conversion of <br /> the new service territory in 1B. Meters have been ordered, working on ensuring that all <br /> customers are in database. <br /> • The power plant staff did the monthly engine run on September 30th. All engines ran well <br /> with no problems. <br /> • Meter Technicians completed the meter swap out for the newly acquired 1 A area in 2 '/2 <br /> days. This was a great accomplishment and helped to ensure that ERMU would have <br /> accurate and complete meter reads as well as all of the databases being correct in our billing <br /> software. <br /> • Jeff Murray and Tony Hubbard attended the Minnesota Electric Meter School September <br /> 14-16 in Roseville, MN. Their education reports are attached. <br /> 111141� WERED er <br /> 11r3 Page 1 of 2 NATURE <br /> Reliable Public <br /> Power Provider P O W E R E D T o S V E <br /> 95 <br />