My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2. ERMUSR 10-13-15
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2015
>
10-13-2015
>
5.2. ERMUSR 10-13-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2015 9:52:26 AM
Creation date
10/20/2015 9:52:26 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
10/13/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River Municipal Utilities <br /> 2016 Utilities Fee Schedule <br /> Proposed Fee Schedule <br /> 2015 Proposed Proposed <br /> Fee Description 2016 Increase <br /> 1 New Residential Electric Connection-Developer-Lot with ERMU water service $ 475.00 $ 475.00 <br /> 2 New Residential Electric Connection-Developer-Lot without ERMU water service $ 575.00 $ 575.00 <br /> 3 New Residential Electric Connection-Builder $ 875.00 $ 875.00 <br /> 4 New Wire Footages over 200'(per foot) $ 4.00 $ 4.00 <br /> 5 New Service Frost Trenching(per foot) $ 5.00 $ 5.00 <br /> 6 New Commercial&Industrial Electric Connection 50% 50% <br /> 7 Service Upgrades or Additions for Existing Customers 100% 100% <br /> 8 Minimum Temporary Electric Service Fee-Existing Transformer $ 150.00 $ 150.00 <br /> 9 Minimum Temporary Electric Service Fee-Without Existing Transformer $ 500.00 $ 500.00 <br /> 10 Street Light-30'Decorative Pole with 6'Arm and Fixture $ 1,850.00 $ 1,850.00 <br /> 11 Street Light-23'Decorative Pole with Traditionaire Fixture $ 1,500.00 $ 1,500.00 <br /> 12 Security Light-Wood Pole with Fixture $ 975.00 $ 975.00 <br /> 13 Security Light-Existing Pole $ 125.00 $ 125.00 <br /> 14 Pole Attachment Fee(per pole) $ 6.50 $ 6.50 <br /> 15 <br /> 16 Water Access Charge=Water Connection Charge+Water Availability Charge $ 3,325.00 $ 345:( 3.01% <br /> 17 Water Connection Charge(Per Plumbing Unit)-Builder $ 3,000.00 $ 3,00),00 3.00% <br /> 18 Water Availability Charge(Per Plumbing Unit)-Developer $ 325.00 $ 330:00 3.08% <br /> 19 Abandoned Water Service $ 2,500.00 $ 2,500.00 <br /> 20 Hydrant Water Sales-Rental(per week) $50/week $50/week <br /> 21 Hydrant Water Sales-Units(per 1000 gallons) $ 4.00 $ 4.00 <br /> 22 Deposit for 5/8"Hydrant Meter $ 150.00 $ 150.00 <br /> 23 Deposit for 2 1/2"Hydrant Meter $ 1,000.00 $ 1,000.00 <br /> 24 Private Hydrant Maintenance Program Monthly Fee $ 5.00 $ 5.00 <br /> 25 <br /> 26 NSF Fee $ 30.00 $ 30.00 <br /> 27 Red Tag Handling Fee $ 20.00 $ 20.00 <br /> 28 Administrative Fee for Continued Submission of Checks After No-Check Notice Given $ 20.00 $ 20.00 <br /> 29 Penalty Amount 10% 10% <br /> 30 Electric Service Disconnect Fee-Meter Technician $ 50.00 $ 50.00 <br /> 31 Electric Service Disconnect Fee-Line Crew $ 150.00 $ 150.00 <br /> 32 Water Shut-Off Fee $ 100.00 $ 100.00 <br /> 33 Meter Tampering Fee $ 250.00 $ 250.00 <br /> 34 Meter Testing Fee $ 50.00 $ 50.00 <br /> 35 Energy Audit $ 50.00 $ 50.00 <br /> 36 <br /> 37 Billable Cost of Materials Markup 15% 15% <br /> 38 Billable Labor Markup _ 55% 55% <br /> 39 Billable Vehicle/Equipment(per employee per hour) $ 30.00 $ 30.00 <br /> 40 <br /> 76 <br />
The URL can be used to link to this page
Your browser does not support the video tag.