My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9.2. SR 10-19-2015
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2015
>
10-19-2015
>
9.2. SR 10-19-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2015 8:47:17 AM
Creation date
10/16/2015 1:59:18 PM
Metadata
Fields
Template:
City Government
type
SR
date
10/19/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The extension is identified in our transportation plans and is one of the key roadway connections desired <br /> by the city. The existing cul-de-sac will be modified to accommodate surface parking north of the <br /> building which is pushed to the west side of the parcel and as close to the bluff line as possible. The <br /> proposed bluff line setback is zero feet. <br /> The extension of Yale Court will likely include a land swap with the bank property to accommodate <br /> proposed roadway geometrics. The buildable section of the parcel available, after accounting for road <br /> right-of-way,is approximately three-quarters of an acre and will require creativity on behalf of the city <br /> and developer to fit the program on site. <br /> Landscaping <br /> With such a small site there is minimal opportunity for landscaping. However, the developer plans to <br /> include a green roof and minimize impervious surface areas as much as possible. During the PUD <br /> process staff will work with the developer to identify potential landscape opportunities. <br /> Budding <br /> Construction is proposed to use the most up-to-date building materials and techniques to ensure <br /> efficiency and promote sustainability. The plan includes five levels above ground and two levels of <br /> parking below ground. The narrative identifies the potential for geothermal heating and cooling, solar <br /> panels above street parking and on the rooftop,horizontal wind turbines mounted to the building, and <br /> numerous "smart" technologies to manage building systems. <br /> Parking <br /> The current plan includes a total of 122 parking spaces. Of these, 16 are surface parking spaces and the <br /> remaining 106 are in the parking garage. Ordinance requires approximately 275 parking spaces, depending <br /> on the retail space configuration. With a small parcel,parking is a concern and the applicant is exploring <br /> additional opportunities for parking. Potential plans include extending one level of underground parking <br /> beneath the current cul-de-sac and tying the surface and structured parking together. Staff will continue <br /> working with the applicant on the parking concerns and the PUD process will allow us flexibility if a <br /> reduced parking demand be identified. <br /> Financial Incentives <br /> The applicant is requesting that the city forgive all of his development fees for planning, SAC/WAC, and <br /> building review/inspection. He is also requesting that the city pay for the installation of the Yale Court <br /> extension and associated trunk utilities, and transfer the building site to the developer. It has not been the <br /> city's practice to waive development fees and staff does not recommend deviating from that practice. <br /> Additionally, the installation of roads and trunk utilities is typically paid for by the developer. <br /> Based on the green initiatives the project qualifies for the PACE program which is a loan to help pay for <br /> green technologies. City staff is exploring additional options that may be available to help finance the <br /> project, and will be in contact with the developer regarding any programs or incentives identified. <br /> In addition to the development impacts, the Council is asked for feedback regarding their appetite for the <br /> requested financial incentives. <br /> N:\PubhcBodies\Agendo Packets\10-19-2015\x9.2 sr 1Nlodern Construction.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.