Laserfiche WebLink
City of Elk River Timeline- Jan 6, 2014-Oct 12. 2015 Visual Communications <br /> 11/17/14 6:00 PM Redesign Attend work session -start revised Sign <br /> Master Plan design to include field stone, <br /> variations on logo additions <br /> 1/11/15 Redesign Provided revised ball park pricing <br /> acquisition. <br /> 2/2/15 6:00 AM x Redeisgn Attend Council meeting <br /> 2/6/15 3:30 PM x x Redesign Redesign and add three new Gateway Sign <br /> options including complete field stone, <br /> partial field stone, logo addition and <br /> variations. <br /> 2/6/15 email x Redesign Provide new budget figures based on all <br /> stone, partial stone, logo addition and so <br /> forth. <br /> 3/23/15 1:30 PM x Redesign Meeting with city staff <br /> Option B is selecetd by Council <br /> 1.Provide six sets of detailed drawings to <br /> obtain tighter ballpark pricing. <br /> (Provide two (2) variations of Option B - one <br /> with more stone, and one with less stone <br /> and more aluminum for compariion.) <br /> 2.Provide updated ballpark pricing for <br /> Council review and comment. <br /> 3/27/15 Specification Provide patterns for three full size signs <br /> 4/6/15 9:00 AM x Specification Meet on site to determine sign size and <br /> readability <br /> 4/27/15 email Redesign Provide final updated pricing for three sizes - <br /> two materials <br /> 6/10/15 email Specification Provide sign rules <br /> Provide final updated pricing for three sizes - <br /> 6/15/15 email Redesign two materials <br /> 7/8/15 email Specification Send Preliminary Specification Documents <br /> Send additional fabrication specifications for <br /> 7/8/15 emqil Redeisgn fabrication alternate <br /> Specification Revisions to plan including one addition of <br /> four sided Kiosk, and various design <br /> variations. <br /> 7/30/05 email Specification <br /> 8/30/15 x Specification Design modifications <br /> Provide final design specificationm <br /> 9/15/15 email Specification documents <br />