Laserfiche WebLink
Project: Owner: Clly of Elk River Application Number 11 <br />Date of application 1015/2015 <br />�m.,a. ......_i_._�.�-_.._.. <br />Wastewater Treatment Facility Improvements 2014 <br />Contractor: <br />Rice Lake Construction Group <br />Engineer. <br />Bolton 8 Monk, Inc. <br />Pay Item <br />Number <br />Item <br />Description <br />B <br />Scheduled Value <br />C <br />From Previous <br />Application (C+D) <br />D E <br />This Periotl Matenals Presently <br />Stored (not In Col D) <br />..-... „..,. y,........ ­n '.1. <br />Total Completed °/ <br />and Stored to Date L) <br />(C + D+ E) <br />..1.I vIJ <br />Balance to <br />Finish <br />07535 <br />07900 <br />Roofing <br />Caulking <br />$235,078.00 <br />$26,870.00 <br />$68,000.00 <br />$7,500.00 <br />$5,000.00 <br />$68.000.00 <br />$12,500.00 <br />28.93 <br />46.52 <br />$167,078.00 <br />$14,370.00 <br />08110 <br />Doors 8 Frames <br />08110.1 <br />08110.2 <br />-Purchase <br />-install$35,000.00 <br />$57,7B0.00 <br />$25.000.00 <br />$0.0ol <br />$15,000.00 <br />$25,000.00 <br />$15,000.00 <br />43.27 <br />42.86 <br />$32,780.00 <br />$20,000.00 <br />08360 <br />Upward Acting Sectional Doors <br />$36,600.00 <br />$0.00 <br />$8,400.00 <br />$8,400.01) <br />22.95 <br />$28,200.00 <br />08500 <br />Windows <br />$25,000.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$25,000.00 <br />08800 <br />Steel Studs/Gypsum <br />$22,869.00 <br />$0.001 <br />$3,600.00 <br />$3,500.00 <br />15.30 <br />$19,369.00 <br />08310 <br />Commic/Realllent Tile <br />$30,000.00 <br />$0.00$0.00 <br />0.001 <br />$30,000.00 <br />09510 <br />Acoustical Coiling <br />$6,500.00 <br />50.00 <br />$0.00 <br />0.00 <br />$6,500.00 <br />09900 <br />Painting <br />$373,921.00 <br />$127,500.00 <br />$37,000.00 <br />$164,500.00 <br />43.99 <br />$209,421.00 <br />10110 <br />Marker Boards/rollet Compartmentarroilet Accessories <br />10110.1 <br />-Purchase <br />$8,000.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$8,000.00 <br />101102 <br />-Install <br />$3,000.00 <br />$0.00 <br />$0.00 <br />().001 <br />$3,000.00 <br />10250 <br />Safety Devices <br />10250.1 <br />-Purchase <br />$10,000.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$10,000.00 <br />10250.2 <br />-Install <br />$3,500.00 <br />$0.001 <br />$0.00 <br />0.00 <br />$3,500.00 <br />10506 <br />Metal Lockers <br />10505.1 <br />-Purchase <br />$10,000.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$10,000.00 <br />10505.2 <br />-Install <br />$4,000.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$4,000.00 <br />11280 <br />Hydraulic Gates <br />11280.1 <br />-Purchase <br />$50,000.00 <br />$5D,000.00 <br />$50,000.00 <br />100.00 <br />$0.00 <br />11280.2 <br />-Install <br />$20,000.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$20,000.00 <br />11311 <br />Submersible Centrifugal Pumps <br />11311.1 <br />-Purchase <br />$278,888.00 <br />$264,924.60 <br />$264,924.60 <br />95.00 <br />$13,943.40 <br />11311.2 <br />-Install <br />$25,00.00 <br />$0.D0 <br />$0.00 <br />0.00 <br />$25,000.00 <br />11345 <br />Chlorination 8 Dechlorinatlon Eq. <br />11345.1 <br />-Purchase <br />$330,000.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$330.001 <br />11345.2 <br />-Install <br />$20,IM0.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$20,000.00 <br />11351 <br />Clarifier Equipment <br />11351.1 <br />-Purchase <br />$15,000.00 <br />$13,507.74 <br />$13,507.74 <br />90.05 <br />$1,492.26 <br />11351.2 <br />-Install <br />$12,000.00 <br />$0.00 <br />$0,00 <br />0.00 <br />$12,000.00 <br />Page 4 of 7 <br />