Laserfiche WebLink
Project: WastewaterTroatment Faculty Improvements 2014 Owner: Cltyof Elk River Application Number 11 <br />Contractor. Rice Lake Construction Group Date of application 10/5(2015 <br />Engineer Bolton & Monk, Inc. Work rAmnlered rhrn,mh <br />Pay Item <br />Number <br />Item <br />Description <br />B <br />Scheduled Value <br />C <br />From Previous <br />Application(C+D) <br />D E <br />This Period Materials Presently <br />Stored (not In Cot D) <br />Total Completed <br />and Stored to Date <br />(C+D+E) <br />% <br />Balance to <br />Finish <br />01001 <br />Performance Bond <br />$230,186.00 <br />$230,186.00 <br />$230,186.00 <br />100.00 <br />$0.00 <br />01002 <br />Insurance <br />$161,171.00 <br />$161,171.00 <br />$161,171.00 <br />100.00 <br />$0.00 <br />01003 <br />Mobilization <br />$635,418.00 <br />$635,418.00 <br />$635,418.00 <br />100.00 <br />$0.00 <br />01004 <br />Demobilization <br />$30,000.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$30,000.00 <br />01008 <br />Project Allowances <br />$695,434.36 <br />$0.00$0.00 <br />0.00 <br />$695,434.36 <br />01005.1 <br />Submittal Exchange <br />$9,795.00 <br />$9.795.001 <br />$9,795.00 <br />100.001 <br />$0.00 <br />01005.2 <br />Building Permit <br />$29,630.04 <br />$29,530.041 <br />$28,530.04 <br />100.00 <br />$0.00 <br />01005.3 <br />LIB Station SCADA System Allowance <br />$230,000.00 <br />$242,268.591 <br />$242,268.59 <br />105.33 <br />($12,268.59) <br />01005.4 <br />COP#01 -Automatic Door Operators <br />$5,963.20 <br />$5,963.20 <br />$5,963.20 <br />100.00 <br />$0.00 <br />01005.5 <br />COP#02- Overflow for Biosollde Holding Tank <br />$2,787.42 <br />$2,787.42 <br />$2,787.42 <br />100.00 <br />$0.00 <br />01005.6 <br />COP#03- Additional Window In Door 1128 <br />$323.84 <br />$323.84 <br />$323.84 <br />100.00 <br />$0.00 <br />01005.7 <br />COP#04 - Delay Costs <br />IN 001 BELOW <br />01005.8 <br />COP#05-Revised Plana <br />$0.00 <br />$0.00 #DIVl01 <br />$0.00 <br />01005.9 <br />COP#08 - Black Material <br />$106,703.90 <br />$106,703.90 <br />$106,703.90 <br />100.00 <br />$0.00 <br />01005.10 <br />COP#07-Slide Gate t6 <br />$5,361.91 <br />$51361.91 <br />$5,361.91 <br />100.00 <br />$0.00 <br />01005.11 <br />COP#08 -Aeration Basin Sumps <br />$10,693.54 <br />$10,693.54$10,893.54 <br />100.00 <br />$0.00 <br />01005.12 <br />COP#09 - Blosollds OH Doors <br />$37,350;46 <br />$37.350.461 <br />$37,350.46 <br />100.001 <br />$0.00 <br />01005.13 <br />COP#10- Aeration Pipe Drop Legs - <br />($3,500.80) <br />($3,500.80) <br />($3,600.80) <br />100.001 <br />$0.00 <br />01005.14 <br />COP#11 - Vlton Gaskets <br />$11,424.64 <br />$11,424.54 <br />$11,424.54 <br />100.001 <br />$0.00 <br />01005-15 <br />COP#12- Supernatant MH Vent <br />$3,686.92 <br />$3,686.92 <br />$3,686.92 <br />100.00 <br />$0.00 <br />01005.16 <br />COP413- Disinfection Channel Gate <br />($1,500.00) <br />$0.00 <br />($1,500.00) <br />($1,500.00) <br />100.001$0.00 <br />01005.17 <br />COP#14 - WasherlDryer Hookups <br />$3,515.73 <br />$0.00 <br />$0.00 <br />0.001 <br />$3,515.73 <br />01005.18 <br />COP#15-Dumpsler Rails <br />$20,796.71 <br />$0.00 <br />$20,796.71$20,796.71 <br />1011301 <br />$0.00 <br />01005.19 <br />COP#16-Retaining Wall <br />TBD <br />$0.00 <br />$0.00 <br />0.001 <br />TBD <br />01005.20 <br />COP#17 -Additional Hydrant & Paving <br />$10,437.29 <br />$0.00 <br />$0.00 <br />0.00 <br />$10,437.29 <br />01005.21 <br />COP#18-Meter Manhole <br />$17,695.94 <br />$0.00 <br />$17,695.94 <br />$17,695.94 <br />100.00 <br />$0.00 <br />02080 <br />Demolition of Existing Facilities/Pavement <br />02060.1 <br />- Main Building <br />$40,000.00 <br />$15,000.00 <br />$15,000.00 <br />37.50 <br />$25,000.00 <br />02060.2 <br />-Blower Building <br />$15,000.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$15,000.00 <br />02060.3 <br />-Aeration Tank <br />$20,000.00 <br />$0.0u <br />$0.00 <br />0.00 <br />$20,000.00 <br />02060.4 <br />-Trickling Filters & Pump Station <br />$45,000.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$45,000.00 <br />02060.5 <br />-Final Clarifier Sludge Wet Well <br />$101000.00 <br />$0.001 <br />$0.00 <br />0.00 <br />$10,000.00 <br />Page 2 of 7 <br />