Laserfiche WebLink
Partial Pay Estimate No.: <br />2015 STREET IMPROVEMENTS <br />CITY OF ELK RIVER <br />SAP 204-135-001.204-107-007.204-114-003.204-116-002 <br />BMI PROJECT NO. N15.108340 <br />YOn,<COMPLETED THROUGH SEPTEMBER 22.2015 <br />41 <br />2504.602 RECONSTRUCT VALVE BOX <br />$719.97 <br />4 <br />EACH <br />$2,879.88 <br />0 <br />EACH <br />$0.00 <br />0.00 <br />EACH <br />$0.00 <br />42 <br />2506.522 ADJUST FRAME AND RING CASTING <br />$426.65 <br />25 <br />EACH <br />$10,666.25 <br />10 <br />EACH <br />$4,266.50 <br />30.00 <br />EACH <br />$12,799.50 <br />43 <br />2511.501 RANDOM RIPRAP CLASS II <br />$98.13 <br />42 <br />CU YD <br />$4,121.46 <br />0 <br />CU YD <br />$0.00 <br />42.00 <br />CU YD <br />$4,121.46 <br />44 <br />2521.602 6" CONCRETE SPILLWAY SPECIAL <br />$213.32 <br />89 <br />EACH <br />$18,985.48 <br />28 <br />EACH <br />$5,972.96 <br />81.00 <br />EACH <br />$17,278.92 <br />45 <br />2531.501 CONCRETE CURB & GUTTER DESIGN B618 <br />$10.61 <br />26613 <br />LIN FT <br />$282,363.93 <br />9868 <br />98687 <br />LIN FT <br />$104,699.48 <br />25,337.00 <br />LIN FT <br />$268,825.57 <br />46 <br />2531.501 CONCRETE CURB & GUTTER DESIGN B818 MEDIAN <br />$10.61 <br />760 <br />LIN FT <br />$8,063.60 <br />LIN FT <br />$0.00 <br />0.00 <br />LIN FT <br />$0.00 <br />47 <br />2531.503 CONCRETE MEDIAN 5" <br />$38.40 <br />96 <br />SO YD <br />$3,686.40 <br />0 <br />SO YD <br />$0.00 <br />0.00 <br />SO YD <br />$0.00 <br />48 <br />2531.507 CONCRETE DRIVEWAY PAVEMENT 7" <br />$43.20 <br />1897 <br />SO YD <br />$81,950.40 <br />508.43 <br />SO YD <br />$21,964.18 <br />1,061.03 <br />SO YD <br />$45,836.50 <br />49 <br />2531.604 CONCRETE MEDIAN NOSE - SPECIAL <br />$57.60 <br />42 <br />SO YD <br />$2,419.20 <br />0 <br />SO YD <br />$0.00 <br />0.00 <br />SO YD <br />$0.00 <br />50 <br />2531.604 7" CONCRETE VALLEY GUTTER <br />$57.60 <br />40 <br />SO YD <br />$2,304.00 <br />56.2 <br />SO YD <br />$3,237.12 <br />56.20 <br />SO YD <br />$3,237.12 <br />51 <br />2535.501 BITUMINOUS CURB 6" <br />$6.24 <br />2100 <br />LIN FT <br />$13,104.00 <br />4159.5 <br />LIN FT <br />$25,955.28 <br />4,159.50 <br />LIN FT <br />$25,955.28 <br />52 <br />2563.601 TRAFFIC CONTROL <br />$8,746.24 <br />1 LUMP SUM <br />$8,746.24 <br />0.95 LUMP SUM <br />$8,308.93 <br />0.95 LUMP SUM <br />$8,308.93 <br />53 <br />2563.601 FLAG PERSON (BNSF CROSSING <br />$15,999.23 <br />1 LUMP SUM <br />$15,999.23 <br />0 LUMP SUM <br />$0.00 <br />0.00 LUMP SUM <br />$0.00 <br />54 <br />2564.531 SIGN PANEL TYPE C <br />$32.00 <br />435 <br />SO FT <br />$13,920.00 <br />3 <br />SO FT <br />$96.00 <br />3.00 <br />SO FT <br />$96.00 <br />55 <br />2565.602 NMC LOOP DETECTOR 6'X 6' <br />$1,056.42 <br />39 <br />EACH <br />$41,200.38 <br />38 <br />EACH <br />$40,143.96 <br />38.00 <br />EACH <br />$40,143.96 <br />56 <br />2573.502 SILT FENCE TYPE MACHINE SLICED <br />$1.92 <br />6498 <br />LIN FT <br />$12,476.16 <br />4026 <br />LIN FT <br />$7,729.92 <br />4,026.00 <br />LIN FT <br />$7,729.92 <br />57 <br />2573.53 STORM DRAIN INLET PROTECTION <br />$127.99 <br />48 <br />EACH <br />$6,143.52 <br />45 <br />EACH <br />$5,759.55 <br />45.00 <br />EACH <br />$5,759.55 <br />58 <br />2573.533 SEDIMENT CONTROL LOG TYPE WOOD CHIP <br />$3.04 <br />3870 <br />LIN FT <br />$11,764.80 <br />147 <br />LIN FT <br />$446.88 <br />876.00 <br />LIN FT <br />$2,663.04 <br />59 <br />2573.535 STABILIZED CONSTRUCTION EXIT <br />$874.63 <br />2 <br />EACH <br />$1,749.26 <br />0 <br />EACH <br />$0.00 <br />0.00 <br />EACH <br />$0.00 <br />60 <br />2574.508 FERTILIZER TYPE 3 <br />$0.53 <br />1745 <br />POUND <br />$924.85 <br />350 <br />POUND <br />$185.50 <br />1,150.00 <br />POUND <br />$609.50 <br />61 <br />2574.525 COMMON TOPSOIL BORROW CV <br />$9.07 <br />2360 <br />CU YD <br />$21,405.20 <br />25 <br />CU YD <br />$226.75 <br />25.00 <br />CU YD <br />$226.75 <br />62 <br />2575.501 SEEDING <br />$133.33 <br />5 <br />ACRE <br />$666.65 <br />2 <br />ACRE <br />$266.66 <br />4.30 <br />ACRE <br />$573.32 <br />63 <br />2575.502 SEED MIXTURE 25-121 <br />$3.35 <br />305 <br />POUND <br />$1,021.75 <br />62 <br />POUND <br />$207.70 <br />202.00 <br />POUND <br />$676.70 <br />64 <br />2575.562 HYDRAULIC MATRIX TYPE BONDED FIBER <br />$1.07 <br />17500 <br />POUND <br />$18,725.00 <br />3500 <br />POUND <br />$3,745.00 <br />3,500.00 <br />POUND <br />$3,745.00 <br />65 <br />2582.501 PAVEMENT MESSAGE LEFT TURN ARROW EPDXY <br />$124.88 <br />9 <br />EACH <br />$1,123.92 <br />8 <br />EACH <br />$999.04 <br />8.00 <br />EACH <br />$999.04 <br />66 <br />2582.501 PAVEMENT MESSAGE RIGHT TURN ARROW EPDXY <br />$124.88 <br />6 <br />EACH <br />$749.28 <br />6 <br />EACH <br />$749.28 <br />7.00 <br />EACH <br />$874.16 <br />67 <br />2582.501 PAVEMENT MESSAGE LEFT-THRU ARROW EPDXY <br />$192.99 <br />2 <br />EACH <br />$385.98 <br />2 <br />EACH <br />$385.98 <br />2.001 <br />EACH <br />$385.98 <br />68 <br />2582.501 PAVEMENT MESSAGE THRU ARROW EPDXY <br />$124.88 <br />2 <br />EACH <br />$249.76 <br />2 <br />EACH <br />$249.76 <br />3.00 <br />EACH <br />$374.64 <br />69 <br />2582.501 PAVEMENT MESSAGE RR XING EPDXY <br />$737.91 <br />4 <br />EACH <br />$2,951.64 <br />0 <br />EACH <br />$0.00 <br />0.00 <br />EACH <br />$0.00 <br />70 <br />2582.502 4" SOLID LINE WHITE - EPDXY <br />$0.26 <br />26856 <br />LIN FT <br />$6,982.56 <br />1693 <br />LIN FT <br />$440.18 <br />1,693.00 <br />LIN FT <br />$440.18 <br />71 <br />2582.502 4" BROKEN LINE WHITE - EPDXY <br />$0.26 <br />1660 <br />LIN FT <br />$431.60 <br />1740 <br />LIN FT <br />$452.40 <br />1,740.00 <br />LIN FT <br />$452.40 <br />72 <br />2582.502 4" SOLID DOUBLE LINE YELLOW - EPDXY <br />$0.51 <br />26428 <br />LIN FT <br />$13,478.28 <br />19099 <br />LIN FT <br />$9,740.49 <br />19,099.00 <br />LIN FT <br />$9,740.49 <br />73 <br />2582.502 24" SOLID LINE WHITE - EPDXY <br />$7.95 <br />285 <br />LIN FT <br />$2,265.75 <br />218.5 <br />LIN FT <br />$1,737.08 <br />218.50 <br />LIN FT <br />$1,737.08 <br />74 <br />2582.503 CROSSWALK MARKING - EPDXY <br />$4.54 <br />1458 <br />SO FT <br />$6,619.321 <br />1314 <br />SO FT <br />$5,965.56 <br />1,314.00 <br />SO FT <br />$5,965.56 <br />TOTAL AMOUNT: <br />$3,731,843.70 <br />$2,249,354.35 <br />$2,931,024.13 <br />CHANGE ORDER #1 <br />75 <br />2021.501 MOBILIZATION <br />$149,206.38 <br />0.05 <br />LUMP SUM <br />$7,460.32 <br />0.05 LUMP SUM <br />$7,460.32 <br />0.05 <br />LUMP SUM <br />$7,460.32 <br />76 <br />2105.501 REMOVE CONCRETE CURB & GUTTER <br />$4.80 <br />35 <br />LIN FT <br />$168.00 <br />10 <br />LIN FT <br />$48.00 <br />10.00 <br />LIN FT <br />$48.00 <br />77 <br />2231.501 BITUMINOUS PATCHING MIXTURE <br />$0.01 <br />25 <br />TON <br />$0.25 <br />0 <br />TON <br />$0.00 <br />0.00 <br />TON <br />$0.00 <br />78 <br />2232.501 MILL BITUMINOUS SURFACE (1.5") <br />$1.38 <br />9900 <br />SO YD <br />$13,662.00 <br />9611 <br />SO YD <br />$13,263.18 <br />9,611.00 <br />SO YD <br />$13,263.18 <br />79 <br />2360.501 TYPE SP 9.5 WEARING COURSE MIXTURE 2,C <br />$61.02 <br />850 <br />TON <br />$51,867.00 <br />781.08 <br />TON <br />$47,661.50 <br />781.08 <br />TON <br />$47,661.50 <br />80 <br />2531.501 CONCRETE CURB & GUTTER DESIGN B618 <br />$10.61 <br />35 <br />LIN FT <br />$371.35 <br />10 <br />LIN FT <br />$106.10 <br />10.00 <br />LIN FT <br />$106.10 <br />$73,528.92 <br />$68,539.10 <br />$68,539.10 <br />CHANGE ORDER #2 <br />81 <br />2021.501 MOBILIZATION <br />$149,206.38 <br />0.05 <br />LUMP SUM <br />$7,460.32 <br />0 LUMP SUM <br />$0.00 <br />0.05 <br />LUMP SUM <br />$7,460.32 <br />82 <br />2104.501 REMOVE CONCRETE CURB & GUTTER <br />$4.80 <br />50 <br />LIN FT <br />$240.00 <br />0 <br />LIN FT <br />$0.00 <br />0.00 <br />LIN FT <br />$0.00 <br />