My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.5. SR 09-07-2004
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2004
>
09/07/2004
>
5.5. SR 09-07-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:33:56 AM
Creation date
9/3/2004 4:13:51 PM
Metadata
Fields
Template:
City Government
type
SR
date
9/7/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TEP Minutes - July 8, 2004 <br /> <br />Attending: Brad Wozney, BWSR; Paul Diedrich, DNR-Fisheries; Terry Mauer, <br />City Engineer; Roger Schmidt & Glen Johnson, Schmidt Gravel Mine; Warren <br />Tuel, Liesch Assoc, Inc; Wayne Jacobson, Applied Environmental Services; <br />Rebecca Haug, City of Elk River <br /> <br />J & B Mining <br /> <br />The setbacks for the site were reduced which allowed for less wetland impacts <br />bringing the total to below 2 acres. This is important when it comes to getting a <br />permit from the Corp. The project does not need to go through the banking <br />process since the mitigation will be on-site. Excess credits will be on the Schuer <br />site however, the applicant is not proposing to bank them, only use them as <br />enhancement. The upland buffer will be at least 25 ft. The proposed type 2 <br />wetland replacement for credit on the east side of the property will not be used. <br />More credits will be bought from the Schuer property for this. Along the western <br />upland buffer area, an opportunity is available for more buffer following the edge <br />of the transformed type 2 wetland. <br /> <br />It was discussed that reed canary grass should not be wasted back into the pond <br />since the seeds will remain and the wetland could become inundated with reed <br />canary grass and also if the pond is to be used for fish habitat, the spoils would <br />cause the water to be cloudy and not desirable to fish. <br /> <br />The topic of using phosphorus for fertilizer was discussed since the city has <br />ordinance restricting phosphorus in fertilizer unless it is used for establishment <br />on new lawn or if soil tests state that it is needed. Since natives will be planted in <br />the area, phosphorus should not be needed. The method of seeding was also <br />discussed and it was determined that harrowing is not required since the seed <br />will be packed. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.