My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3. SR 09-07-2004
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2004
>
09/07/2004
>
5.3. SR 09-07-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:33:55 AM
Creation date
9/3/2004 4:12:45 PM
Metadata
Fields
Template:
City Government
type
SR
date
9/7/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J&B Mining <br />Page 3 <br /> <br />The SWPPP should include the referenced NPDES discharge permit as an Appendix. In section 4.1, <br />the SWPPP should be modified to include provisions for removing tracked sediments from paved <br />roadways on a regular basis. In section 5.1, SWPPP inspection should be conducted on a monthly <br />(required by NPDES permit) basis during active operations. The Site map should identify "National <br />Wetland Inventory" data on it showing all information within a one-mile radius of the Site. The <br />SWPPP should identify if Site drainage enters "waters of the State". If so, the locations should be <br />identified on Site maps. <br /> <br />The Plan should identify the placement of dp-rap in the ditch near the east property boundary as an <br />erosion control BMP. It is possible that surface water flow from the site will be increased with the <br />removal of vegetation over a majority of the site. <br /> <br />A phasing and restoration plan should be provided with the SWPPP to facilitate the implementation of <br />BMPs, which includes revegetation of parts of the site. The SWPPP should identify the ongoing <br />inspection of the surface water ditch as it exits the site on the east property boundary. <br /> <br />Environmental Spill Plan The Plan has been developed with an acceptable general outline. The <br />Plan should state that there will be no maintenance of the equipment on the site. The Plan should <br />identify the contents and capacity of the spill kit that is provided with the refueling vehicle. <br /> <br />A specific refueling location(s) should be identified in the Plan in an area(s) where spill response can <br />be effectively implemented. The refueling location(s) would ideally be an area(s) with a relatively <br />impermeable surface, closed contours and minimal slope. <br /> <br />Q:~A-C\CER~2004-51 l\Correspondence~J&B_MiningReview, doc <br /> <br />3 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.