Laserfiche WebLink
Page 3 <br />Mr. Steve Rohlf <br />March 29, 2004 <br /> <br />The mined material will be hauled to Elk River Bituminous located approximately 1A-mile south of <br />the Property using a private access road, as approved as part of the original CUP. Mining <br />operations be conducted between the hours of 7:00 AM and 7:00 PM as required by the City of Elk <br />River. All mitigative measures currently in place at the Property as part of the previous CUP for <br />Phases 1-3, (i.e dust control, noise control, and spill prevention and response), will be followed as part <br />of Phase 4 mining. <br /> <br />If you have any questions or comments regarding the enclosed, please call me at (763) 489-3178 or Glen <br />Johnson, Site Manager at (320) 252-8817. Thank you for your time and assistance with this project. <br /> <br />Sincerely, <br /> <br />LIESCH ASSOCIATES, INC. <br />Environmental Geologist <br /> <br />Enclosures <br /> <br />Cc.' <br /> <br />Roger Schmidt <br />Glen Johnson <br />John Lichter - Liesch <br /> <br />w:\env\64480\CUP submittal ltr.032904.doc <br /> <br />THE LIESCH COMPANIES MINNEAPOLIS, MN MADISON, WI SCO'FI'SDALE, AZ <br /> <br /> <br />