Laserfiche WebLink
00) <br /> <br />(11) <br /> <br />Each year a plan for that year's reclamation shall be approved by the <br />Building and Environmental Administrator prior to issuance of the <br />mineral excavation license. <br /> <br />Upland reclamation shall include topsoil from the site being <br />preserved and put back into place after mining and seeded as per the <br />approved plans. The vegetation established for the reclamation must <br />be maintained until it is self-sufficient. <br /> <br />Wetland restoration shall be in compliance with the approved <br />wetland mitigation plan. The Operator shall provide a letter of credit <br />in favor of the City for wetland restoration in the amount of $ A <br />formal wetland monitoring plan shall be submitted for City approval <br />one year after wetland restoration has been completed on the <br />Property and the J & B Mining site. The wetland letter of credit may <br />be released upon approval of the first year monitoring report, but <br />monitoring shall continue for an additional 2 to 4 years after, as <br />determined by city staff. <br /> <br />Contours, finished grades, details of erosion control methods, and <br />settling ponds, shall comply with the plans submitted and the City <br />ordinance at the time of reclamation. Additional measure as <br />determined by city staff may be required. <br /> <br />Traffic <br /> <br />Material mined as part of this Operation shall be hauled direcfly to <br />the Elk River Bituminous site via easements, not accessing any public <br />road. Access to Highway 169 at 219th Avenue will be eliminated <br />when frontage roads leading to interchanges are developed. <br /> <br />All portions of drives shared by this Operation and another business <br />or residence shall be a minimum of twenty feet wide and hard <br />surfaced. The Operator shall provide the City with executed copies <br />of all agreements concerning the ability to make improvements to <br />these drives and their maintenance prior to the Operation <br />commencing. <br /> <br />The sale of product from the Operation shall only take place from <br />the Elk River Bituminous site and then only after receiving <br />authorization from the Minnesota Department of Transportation and <br />completing all required improvements to the access for that site prior <br />to commencing said sales. <br /> <br />Dust Control <br /> <br />A permit from MPCA regarding air emissions shall be obtained when <br />required and particulate emission standards shall be met by the <br /> <br /> <br />