Laserfiche WebLink
Capital Improvement Plan 2016 ihru 2020 <br />City of Elk River, Minnesota <br />Project # PM -01 <br />Project Name Pavement Management Program <br />Department <br />Infrastructure Improvements <br />Contact <br />Engineer <br />Type <br />Improvement <br />Useful Life <br />25 years <br />Category <br />Street & Utility Construction <br />Priority <br />n/a <br />Description I <br />Zeplace, overlay or rehabilitate aged and deteriorated streets, storm drainage, and adjacent walks. Projects will be completed every other year. <br />Justification I <br />ndividual street pavement conditions will dictate what pavement management technique will be utilized to extend the life of that specific street <br />segment. These techniques may range from a full reconstruction of the surface and aggregate base to simply overlaying the existing pavement. As <br />hey are implemented, the prescribed techniques will continually be gauged to assure their performance is proper in extending the life of our <br />Expenditures 2016 2017 2018 2019 2020 Total <br />Construction/Maintenance 4,480,000 4,500,000 8,980,000 <br />Preliminary Design 100,000 100,000 100,000 300,000 <br />Total 100,000 4,480,000 100,000 4,500,000 100,000 9,280,000 <br />Funding Sources 2016 <br />2017 <br />2018 2019 <br />2020 Total <br />Municipal State Aid <br />1,000,000 <br />1,000,000 <br />2,000,000 <br />Pavement Management Fund 100,000 <br />3,330,000 <br />100,000 3,350,000 <br />100;000 6,980,000 <br />Storm Sewer <br />150,000 <br />150,000 <br />300,000 <br />Total 100,000 4,480,000 100,000 4,500,000 100,000 9,280,000 <br />2016-2020 DRAFT CAPITAL IMPROVEMENT PLAN <br />