My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.4. ERMUSR 09-08-2015
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2015
>
09-08-2015
>
2.4. ERMUSR 09-08-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2015 11:52:05 AM
Creation date
9/22/2015 11:08:28 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
9/8/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.3 Loss-of-Revenue Payments. Subject to Sections 2.4, 2.5, 2.6, and 2.7, <br /> the Municipal shall annually pay the Cooperative the amounts described in this Section <br /> as loss-of-revenue compensation. <br /> (a) For each Affected Area except for Area 1, an amount equal to the result of <br /> multiplying twenty-one mills ($0.021) times each kilowatt hour of electric energy sold by <br /> the Municipal to each third party to whom the Municipal provides retail electric service in <br /> the Affected Area for the period of ten (10) years commencing on the first full year <br /> ending in December 31 that the Municipal provides service after the Transfer Date. <br /> (b) For Area 1, an amount equal to the result of multiplying twenty-two mills <br /> ($0.022) times each kilowatt hour of electric energy sold by the Municipal to each third <br /> party to whom the Municipal provides retail electric service in Area 1 for the period of <br /> ten (10) years commencing on the Transfer Date. The Parties acknowledge and agree <br /> that the additional compensation for Area 1 is contingent upon the deferral of the <br /> Municipal constructing a tie line, anticipated from the City boundary on County Road 12 <br /> near the intersection with County Road 40 to the Elk River Station 14 Bank 4, and the <br /> Parties entering a separate interconnection agreement, as described in Section 2.8. In <br /> the event that the Municipal must construct a tie line in Area 1 within the ten-year period <br /> commencing with the Transfer Date, the loss-of-revenue compensation for Area 1 for <br /> the years remaining in the this ten-year period shall be the amount stated in Section <br /> 2.3(a). <br /> 2.4 Indexing. The Parties will annually establish an indexed mill rate for the <br /> loss-of-revenue specified in Section 2.3. The index will be established as follows: <br /> (a) The Parties will use the Gross Domestic Product — Implicit Price Deflator <br /> prepared by the Bureau of Economic Analysis of the United States Department of <br /> 5 <br /> 54 <br />
The URL can be used to link to this page
Your browser does not support the video tag.