Laserfiche WebLink
Address: YAC & Oak Knoll Fields <br />General Contractor: Terra General Contractors <br />Project Manager: Tom Brown <br />Superintendent: TBD <br />Schedule Duration: TBD <br />Total Sq Ft Sq ft <br />COST ITEM Estimate SUBCONTRACTOR <br />CODE DESCRIPTION NOTES <br />GENERAL CONDITIONS <br />01-0120 Permit allowance 2,998.05$ Allowance <br />01-0130 Liability insurance 672.09$ Liability Insurance <br />01-0140 Builders Risk Insurance N/A Not required for this project <br />01-1000 Supervision 6,000.00$ Supervision <br />01-1010 GC Misc 500.00$ Materials <br />01-1111 Preconstruction N/A <br />01-1550 Final Clean 800.00$ Incl final clean <br />General Conditions Total 10,970.14$ Total for General conditions <br />02-2070 Demolition NIC <br />02-2071 Earthwork 14,296.00$ <br />02-2831 Fencing/Steel Framing 68,000.00$ Vinyl Coated, $8,500/Dugout. Galvanized Steel in Price <br />03-3053 Concrete 36,032.00$ <br />04-4200 Masonry 22,176.00$ <br />05-5120 Steel In Fencing <br />07-7400 Metal Roofing 37,632.00$ $4,704 per dugout <br />09-9910 Paint 6,000.00$ $750 per dugout, 2 coats <br />SUBTOTAL 195,106.14$ <br />01-2400 OVERHEAD & PROFIT 10%19,510.61$ <br />GUARANTEED NOT TO EXCEED TOTAL 214,616.75$ <br />Alt# 1 Structural Steel 43,181.00$ $10,795 per Field (D&M Iron Works) <br />Alt# 2 Hot Dip Galvanize all Steel 9,120.00$ $1,140 per dugout (D&M Iron Works) <br />Note #1 <br />Note #2 <br />Note #3 <br />SUBMITTED BY: Tom Brown - Project Manager <br />SIGNATURE: <br />ACCEPTED BY: <br />Elk River Youth Baseball Dugouts