Laserfiche WebLink
engineering <br /> CORE STATES <br /> architecture <br /> project management <br /> construction management <br /> permitting , <br /> development services <br /> GROUP <br /> 5. Number of parking stalls, existing and additional <br /> a. The existing property contains 79 parking spaces. The proposed project will eliminate 6 spaces, <br /> bringing the overall total down to 73 total spaces. <br /> 6. Is there proposed screening of the site? <br /> a. No. <br /> 7. Proposed building materials—how do they comply with applicable design standards? <br /> a. Proposed building materials will be complimentary to those on the existing facades. Refer to <br /> plans provided with the submittal package for additional information. <br /> 8. Signage—how many, what type and locations? <br /> a. The current Panera signage will be replaced on three(3)sides of the building as shown on the <br /> attached plans. In addition to updating to Panera's current standard logo, `drive thru' signage will <br /> now also be included on the east and west elevations. <br /> 9. Is there outdoor storage? What is being stored? How much? Proposed screening? <br /> a. Outdoor storage is not proposed as a part of this project. <br /> Please review this information along with our submitted plans and associated documentation and let us know <br /> if you have any questions,comments or concerns. <br /> Respectfully submitted, <br /> / <br /> Patrick T. Bennett, P.E. <br /> Core States Group/Project Manager <br /> 50 crestwood executive center.suite 500.st.Louis,mo 63126.v.314.843.4320.f:314.843.4323 <br /> georgic) . virgiric . new jersey . mossachusetts . missouri florida . north corolina . arkansas . california . pennsylvania . texas illinois <br />