Laserfiche WebLink
Project: Omer: City of Elk River Application Number 10 <br />Date of application 914f2015 <br />Work completed through: 9412015 <br />Wastewater Treatment Facility Improvements 2014 <br />Contractor: <br />Rice take Construction Group <br />Engineer: <br />Bolton & Menk, Inc. <br />Page 6 of 7 <br />Item <br />B <br />C <br />D E <br />Total Completed <br />% <br />Balance to <br />Pay Item Number <br />Description <br />Scheduled Value <br />From Previous <br />Application (C -D) <br />This Period Materials Presently <br />Stored (not in Col D) <br />and Stored to Date <br />(C t D + E) <br />U <br />Finish <br />15060.2 <br />-Install <br />$200,000.00 <br />$20,000.00 <br />$50,000.00 <br />$70,000.00 <br />35.00 <br />$130,000.00 <br />15100 <br />Valves <br />15100.1 <br />-Purchase <br />$265,000.00 <br />$257,000.00 <br />$8,000.00 <br />$265,000.D0 <br />100.00 <br />$0.00 <br />15100.2 <br />-Install <br />$110,000.00 <br />$15,000.00 <br />$15,000.00 <br />$30,000.00 <br />27.27 <br />$86,000.00 <br />15300 <br />Fire Protection <br />$45,000.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$45,000.00 <br />15400 <br />Plumbing <br />15400.1 <br />-Copper Piping <br />15400.1.1 <br />-Purchase <br />$45,000.00 <br />$25,000.00 <br />$25,000.00 <br />55.56 <br />$20,000.00 <br />15400.1.2 <br />-Install <br />$100,000.00 <br />$65,000.00 <br />$65,000.00 <br />65.00 <br />$35,000.00 <br />15400.2 <br />-Chemical Piping <br />15400.2.1 <br />-Purchase <br />$18,000.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$18,000.00 <br />15400.2.2 <br />-Install <br />$22,000.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$22,000.00 <br />15400.3 <br />-Waste & Vent Piping <br />15400.3.1 <br />-Purchase <br />$30,000.00 <br />$27,000.00 <br />$27,000.00 <br />gatiol <br />$3,000.00 <br />15400.3.2 <br />-Install <br />$62,000.00 <br />$55,800.00 <br />$55,800.00 <br />90.00 <br />$6,200.00 <br />15480 <br />Packaged Compressed Air System <br />15480.1 <br />-Purchase <br />$5,000.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$5,000.00 <br />15480.2 <br />-Install <br />$1,500.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$1,500.00 <br />15500 <br />HVAC <br />15500.1 <br />Equipment <br />$286,200.00 <br />$106,3`18.001 <br />$2,274.50 <br />$108,592.50 <br />37.94 <br />$177,607.50 <br />15500.2 <br />Labor <br />$169,020.00 <br />$14,244.50 <br />$14,244.50 <br />8.43 <br />$154,775.50 <br />15500.3 <br />Duct Insulation <br />$24,780.00 <br />$0.00 <br />$0.00 <br />0.001 <br />$24,780.00 <br />15500.4 <br />Teat & Balance <br />$5,000.00 <br />$0.00 <br />$0.00 <br />0.001 <br />$5,000.00 <br />15950 <br />HVAC Controls <br />$67,400.00 <br />$7,000.00 <br />$7,000.00 <br />10.39 <br />$60,400.00 <br />16000 <br />Electrical <br />16000.1 <br />General Provisions <br />$55,000.00 <br />$31,500.00 <br />$31,500.00 <br />57.27 <br />$23,500.00 <br />16000.2 <br />Basic Materials and Methods <br />$265,000.00 <br />$31,500.00 <br />$21,400.00 <br />$52,900.00 <br />19.96 <br />$212,100.00 <br />16000.3 <br />Motors <br />$32,000.00 <br />$0.00 <br />$1,400.00 <br />$1,400.00 <br />4.38 <br />$30,600.00 <br />16000.4 <br />Power Generation System <br />$414.000.00 <br />$4,70D.00 <br />$392,500.00 <br />$397,200.00 <br />95.94 <br />$16,800.00 <br />16000.5 <br />Electrical Distribution <br />$385,000.00 <br />$9,700.00 <br />$16,400.00 <br />$26,100.00 <br />6.78 <br />$358,900.00 <br />16000.6 <br />Lighting <br />$85,000.00 <br />$17,600.00 <br />$9,150.00 <br />$26,750.00 <br />31.47 <br />$58,250.00 <br />16000.7 <br />Special Systems <br />$24.000.00 <br />$0.00 <br />$980.00 <br />$980.00 <br />4.08 <br />$23,020.00 <br />16000.8 <br />Istarters and Motor Control <br />$330,000.00 <br />$7,100.00 <br />$4.200.001 <br />1 $11,300.001 <br />3.42 <br />$318,700.00 <br />Page 6 of 7 <br />