Laserfiche WebLink
Project Owner: City of Elk River Applicalion Number 10 <br />Date of application 9/4/2015 <br />Work completed Ihrough: 91412015 <br />Wastewater Treatment Facility Improvements 2014 <br />Contractor: <br />Rice Lake Construction Group <br />Engineer: <br />Bolton & Monk, Inc. <br />Item <br />Pay Item Number Description <br />B <br />Scheduled Value <br />C <br />From Previous <br />Application (C+D) <br />D E <br />This Period Materials Presently <br />Stored (not in Col D) <br />Total Completed <br />and Stored to Date <br />(C + D + E) <br />% <br />U <br />Balance to <br />Finish <br />01001 <br />Performance Bond <br />$230,186.00 <br />$230,186-00 <br />$230,186.00 <br />100.00 <br />$0.00 <br />01002 <br />Insurance <br />$161,171.00 <br />$161,171.00 <br />$161,171.00 <br />100.00 <br />$0.00 <br />01003 <br />Mobilimtion <br />$635,418.00 <br />$635,418.00 <br />$635,418.00 <br />100.00 <br />$0.00 <br />01004 <br />Demobilization <br />$30,000.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$30,000.00 <br />01005 <br />Project Allowances <br />$748,380.03 <br />$0.00 <br />1 <br />$0.00 <br />0.00 <br />$746,380.03 <br />01005.1 <br />Submittal Exchange <br />$9,795.00 <br />$9,795.00 <br />$9,795.00 <br />100.00 <br />$0.00 <br />01005.2 <br />Building Permit <br />$29,530.04 <br />$29,530.04 <br />$29,530.04 <br />100.00 <br />$0.00 <br />01005.3 <br />Lift Station SCADA System Allowance <br />$230,000.00 <br />$242,268.59 <br />$242,268.59 <br />105.33 <br />($12,268.59) <br />01005.4 <br />COP#01-Automatic Door Operators <br />$5,963.20 <br />$5,963.20 <br />$5,963.20 <br />100.00 <br />$0.00 <br />01005,5 <br />COPk02- Overflow for Biosolids Holding Tank <br />$2,787.42 <br />$2,787.42 <br />$2,787.42 <br />100.00 <br />$0.00 <br />01005.6 <br />COP#03 -Additional Window in Door 112B <br />$323.84 <br />$323.04 <br />$323.84 <br />100.00 <br />$0.00 <br />01005.7 <br />COPH04 - Delay Casts <br />IN COI BELOW <br />01005.8 <br />JCOP#05 - Revised Plans <br />$0.00 <br />$0.001 #DIV/01 <br />$0.00 <br />01005.9 <br />COP#06-Black Material <br />$106,703.90 <br />$106,703.90 <br />$106,703.90 <br />100.00 <br />$0.00 <br />01005.10 <br />COP#07-Side Gate 16 <br />$5,36191 <br />$5,361.91 <br />$5,361.91 <br />100.00 <br />$0.00 <br />01005.11 <br />COP#08 - Aeration Basin Sumps <br />$10,693.54 <br />$10,693.54 <br />$10,693.54 <br />100.00 <br />$0.00 <br />01005.12 <br />COP#09- Biosolids OH Doors <br />$37,350.46 <br />$37,350.46 <br />$37,350.46 <br />100.00 <br />$0.00 <br />01005.13 <br />COP#10-Aeration Pipe Drop Legs <br />($3,500.80) <br />($3,500.80) <br />($3,500.80) <br />100.00 <br />$0.00 <br />01005.14 <br />COP#11 - Vitan Gaskets <br />$11,424.54 <br />$11,424.54 <br />$11,424.54 <br />100.00 <br />$0.00 <br />01005.15 <br />COP#12- Supernatant MH Vent <br />$3,686.92 <br />$3,686.921 <br />$3,686.92 <br />100.001 <br />50.00 <br />02060 <br />Demolition of Existing FacilitleelPavement <br />02060.1 <br />-Main Building <br />$40,000.00 <br />$15,000.00 <br />$15,000.00 <br />37,501 <br />$25,000.00 <br />02060.2 <br />-Blower Building <br />$15,000.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$15,000.00 <br />02060.3 <br />-Aeration Tank <br />$20,000.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$20,000.00 <br />02060.4 <br />- Trickling Fillers & Pump Station <br />$45,000.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$45,000.00 <br />02060.5 <br />- Final Clarifier Sludge Wel Well <br />$10,000.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$10,000.00 <br />02060.6 <br />-Pavement <br />$10,510.00 <br />$8,500.00 <br />$8,500.00 <br />80.88 <br />$2,010.00 <br />02140 <br />Bypass Pumping <br />$75,000.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$75,000.00 <br />02220 <br />Earthwork <br />02220.1 <br />- New Aeration Basins <br />$355,815.00 <br />$355,815.00 <br />$355,815.00 <br />100.001 <br />$0.00 <br />02220.2 <br />- New Proposed Aerated Biosolids Control Bldg 2 <br />$65,000.00 <br />$65,000.00 <br />$65,000.00 <br />100.00 <br />$0.00 <br />02220.3 <br />- New R4SANAS Building <br />$58,000.00 <br />$45,000.00 <br />$13,000.00 <br />$58,000.00 <br />100.001 <br />$0.00 <br />02220.4 <br />- New Operations Building <br />$85,000.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$85,000.00 <br />Page 2 of 7 <br />