Laserfiche WebLink
Partial Pay Estimate No.: <br />2015 STREET IMPROVEMENTS <br />CITY OF ELK RIVER <br />SAP 204-135-001.204-107-007.204-114-003.204-116-002 <br />BMI PROJECT NO. N15.108340 <br />WCI=IX COMPLETED THROUGH AUGUST 28. 2015 <br />1 <br />2021.501 <br />MOBILIZATION <br />$149,206.38 <br />1 LUMP SUM <br />$149,206.38 <br />1 LUMP SUM <br />$149,206.38 <br />1.00 LUMP SUM <br />$149,206.38 <br />2 <br />2101.511 <br />CLEARING AND GRUBBING <br />$3,733.15 <br />1 LUMP SUM <br />$3,733.15 <br />0 LUMP SUM <br />$0.00 <br />0.80 LUMP SUM <br />$2,986.52 <br />3 <br />2104.501 <br />REMOVE CONCRETE CURB & GUTTER <br />$4.80 <br />880 <br />LIN FT <br />$4,224.00 <br />609 <br />LIN FT <br />$2,923.20 <br />609.00 <br />LIN FT <br />$2,923.20 <br />4 <br />2104.501 <br />REMOVE SEWER PIPE STORM <br />$10.93 <br />764 <br />LIN FT <br />$8,350.52 <br />0 <br />LIN FT <br />$0.00 <br />0.00 <br />LIN FT <br />$0.00 <br />5 <br />2104.503 <br />REMOVE CONCRETE DRIVEWAY PAVEMENT <br />$1.33 <br />5013 <br />SQ FT <br />$6,667.29 <br />4192 <br />SQ FT <br />$5,575.36 <br />4,192.00 <br />SQ FT <br />$5,575.36 <br />6 <br />2104.505 <br />REMOVE CONCRETE VALLEY GUTTER <br />$14.40 <br />40 <br />SQ YD <br />$576.00 <br />56.2 <br />SQ YD <br />$809.28 <br />56.20 <br />SQ YD <br />$809.28 <br />7 <br />2104.505 <br />REMOVE BITUMINOUS DRIVEWAY PAVEMENT <br />$5.07 <br />1628 <br />SQ YD <br />$8,253.96 <br />977.4 <br />SQ YD <br />$4,955.42 <br />3,151.50 <br />SQ YD <br />$15,978.11 <br />8 <br />2104.505 <br />REMOVE BITUMINOUS PAVEMENT <br />$6.24 <br />400 <br />SQ YD <br />$2,496.00 <br />0 <br />SQ YD <br />$0.00 <br />0.00 <br />SQ YD <br />$0.00 <br />9 <br />2105.501 <br />COMMON EXCAVATION P <br />$17.60 <br />16416 <br />CU YD <br />$288,921.60 <br />0 <br />CU YD <br />$0.00 <br />12,222.00 <br />CU YD <br />$215,107.20 <br />10 <br />2105.505 <br />MUCK EXCAVATION LV <br />$0.53 <br />12000 <br />CU YD <br />$6,360.00 <br />0 <br />CU YD <br />$0.00 <br />0.00 <br />CU YD <br />$0.00 <br />11 <br />2105.507 <br />SUBGRADE EXCAVATION EV <br />$10.13 <br />710 <br />CU YD <br />$7,192.30 <br />483 <br />CU YD <br />$4,892.79 <br />1,623.00 <br />CU YD <br />$16,440.99 <br />12 <br />2105.521 <br />GRANULAR BORROW CV <br />$0.53 <br />14200 <br />CU YD <br />$7,526.00 <br />0 <br />CU YD <br />$0.00 <br />0.00 <br />CU YD <br />$0.00 <br />13 <br />2105.522 <br />SELECT GRANULAR BORROW CV <br />$0.53 <br />710 <br />CU YD <br />$376.30 <br />0 <br />CU YD <br />$0.00 <br />0.00 <br />CU YD <br />$0.00 <br />14 <br />2105.535 <br />PLACE SALVAGED AGGREGATE FROM STOCKPILE CLASS 7 <br />$4.001 <br />7275 <br />CU YD <br />$29,100.00 <br />561 <br />CU YD <br />$2,244.00 <br />4,150.00 <br />CU YD <br />$16,600.00 <br />15 <br />2105.607 <br />POND EXCAVATION P <br />$10.40 <br />665 <br />CU YD <br />$6,916.00 <br />0 <br />CU YD <br />$0.00 <br />0.00 <br />CU YD <br />$0.00 <br />16 <br />2118.607 <br />AGGREGATE SURFACING CV CLASS 2 <br />$63.90 <br />925 <br />CU YD <br />$59,107.50 <br />646 <br />CU YD <br />$41,279.40 <br />646.00 <br />CU YD <br />$41,279.40 <br />17 <br />2211.501 <br />AGGREGATE BASE CV CLASS 5 <br />$10.67 <br />15570 <br />TON <br />$166,131.90 <br />0 <br />TON <br />$0.00 <br />2,801.00 <br />TON <br />$29,886.67 <br />18 <br />2215.501 <br />BITUMINOUS PAVEMENT RECLAMATION IN-PLACE 8" DEPTH <br />$1.62 <br />48764 <br />SQ YD <br />$78,997.68 <br />61018.68 <br />SQ YD <br />$98,850.26 <br />61,018.68 <br />SQ YD <br />$98,850.26 <br />19 <br />2215.501 <br />BITUMINOUS PAVEMENT RECLAMATION 8" DEPTH <br />$2.08 <br />32576 <br />SQ YD <br />$67,758.08 <br />0 <br />SQ YD <br />$0.00 <br />32,576.00 <br />SQ YD <br />$67,758.08 <br />20 <br />2231.501 <br />BITUMINOUS PATCHING MIXTURE <br />$0.01 <br />675 <br />TON <br />$6.75 <br />27.33 <br />TON <br />$0.27 <br />27.33 <br />TON <br />$0.27 <br />21 <br />2231.604 <br />BITUMINOUS PATCH - SPECIAL ROADWAY <br />$42.35 <br />800 <br />SQ YD <br />$33,880.00 <br />781 <br />SQ YD <br />$33,075.35 <br />781.00 <br />SQ YD <br />$33,075.35 <br />22 <br />2231.604 <br />BITUMINOUS PATCH - SPECIAL DRIVEWAY <br />$29.28 <br />1938 <br />SQ YD <br />$56,744.64 <br />977.4 <br />SQ YD <br />$28,618.27 <br />2,023.50 <br />SQ YD <br />$59,248.08 <br />23 <br />2232.501 <br />MILL BITUMINOUS SURFACE 1.5" <br />$1.38 <br />4226 <br />SQ YD <br />$5,831.88 <br />108971 <br />SQ YD <br />$15,037.86 <br />10,897.00 <br />SQ YD <br />$15,037.86 <br />24 <br />2232.501 <br />MILL BITUMINOUS SURFACE 3" <br />$1.11 <br />6563 <br />SQ YD <br />$7,284.93 <br />12852.86 <br />SQ YD <br />$14,266.67 <br />12,852.86 <br />SQ YD <br />$14,266.67 <br />25 <br />2232.501 <br />MILL BITUMINOUS SURFACE TAPER 0" - 2" <br />$0.92 <br />11305 <br />SQ YD <br />$10,400.60 <br />8917 <br />SQ YD <br />$8,203.64 <br />8,917.00 <br />SQ YD <br />$8,203.64 <br />26 <br />2360.501 <br />TYPE SP 9.5 WEARING COURSE MIXTURE 2,C <br />$61.02 <br />19037 <br />TON <br />$1,161,637.74 <br />10312.59 <br />TON <br />$629,274.24 <br />10,312.59 <br />TON <br />$629,274.24 <br />27 <br />2360.501 <br />TYPE SP 9.5 WEARING COURSE MIXTURE 4,E <br />$60.09 <br />3486 <br />TON <br />$209,473.74 <br />3788.22 <br />TON <br />$227,634.14 <br />3,788.22 <br />TON <br />$227,634.14 <br />28 <br />2360.502 <br />TYPE SP 12.5 NON WEARING COURSE MIXTURE 2,C <br />$54.65 <br />11648 <br />TON <br />636563.2 <br />6186 <br />TON <br />$338,064.90 <br />6,186.00 <br />TON <br />$338,064.90 <br />29 <br />2411.618 <br />MODULAR BLOCK RETAINING WALL <br />$30.53 <br />525 <br />SQ FT <br />$16,028.25 <br />0 <br />SQ FT <br />$0.00 <br />0.00 <br />SQ FT <br />$0.00 <br />30 <br />2501.515 <br />12" RC PIPE APRON <br />$602.64 <br />16 <br />EACH <br />$9,642.24 <br />0 <br />EACH <br />$0.00 <br />0.00 <br />EACH <br />$0.00 <br />31 <br />2501.515 <br />15" RC PIPE APRON <br />$693.30 <br />6 <br />EACH <br />$4,159.80 <br />0 <br />EACH <br />$0.00 <br />0.00 <br />EACH <br />$0.00 <br />32 <br />2501.515 <br />18" RC PIPE APRON <br />$735.96 <br />6 <br />EACH <br />$4,415.76 <br />01 <br />EACH <br />$0.00 <br />0.001 <br />EACH <br />$0.00 <br />33 <br />2501.601 <br />DRAINAGE IMPROVEMENTS AND REPAIR PIPE CULVERT <br />$3,749.16 <br />1 LUMP SUM <br />$3,749.16 <br />1 LUMP SUM <br />$3,749.16 <br />1.00 LUMP SUM <br />$3,749.16 <br />34 <br />2501.602 <br />TRASH GUARD FOR 12" PIPE ARPON <br />$351.98 <br />16 <br />EACH <br />$5,631.68 <br />0 <br />EACH <br />$0.00 <br />0.00 <br />EACH <br />$0.00 <br />35 <br />2501.602 <br />TRASH GUARD FOR 15" PIPE ARPON <br />$405.31 <br />6 <br />EACH <br />$2,431.86 <br />0 <br />EACH <br />$0.00 <br />0.00 <br />EACH <br />$0.00 <br />36 <br />2501.602 <br />TRASH GUARD FOR 18" PIPE ARPON <br />$474.64 <br />6 <br />EACH <br />$2,847.84 <br />0 <br />EACH <br />$0.00 <br />0.00 <br />EACH <br />$0.00 <br />37 <br />2503.541 <br />12" RC PIPE SEWER DESIGN 3006 CLASS V <br />$30.93 <br />532 <br />LIN FT <br />$16,454.76 <br />0 <br />LIN FT <br />$0.00 <br />0.00 <br />LIN FT <br />$0.00 <br />38 <br />2503.541 <br />15" RC PIPE SEWER DESIGN 3006 CLASS V <br />$33.07 <br />229 <br />LIN FT <br />$7,573.03 <br />0 <br />LIN FT <br />$0.00 <br />0.00 <br />LIN FT <br />$0.00 <br />39 <br />2503.541 <br />18" RC PIPE SEWER DESIGN 3006 CLASS V <br />$37.33 <br />300 <br />LIN FT <br />$11,199.00 <br />0 <br />LIN FT <br />$0.00 <br />0.00 <br />LIN FT <br />$0.00 <br />40 <br />2504.602 <br />ADJUST GATE VALVE AND BOX <br />$266.65 <br />13 <br />EACH <br />$3,466.45 <br />13 <br />EACH <br />$3,466.45 <br />13.00 <br />EACH <br />$3,466.45 <br />41 <br />2504.602 <br />RECONSTRUCT VALVE BOX <br />$719.97 <br />4 <br />EACH <br />$2,879.88 <br />0 <br />EACH <br />$0.00 <br />0.00 <br />EACH <br />$0.00 <br />42 <br />2506.522 <br />ADJUST FRAME AND RING CASTING <br />$426.65 <br />25 <br />EACH <br />$10,666.25 <br />10 <br />EACH <br />$4,266.50 <br />10.00 <br />EACH <br />$4,266.50 <br />43 <br />2511.501 <br />RANDOM RIPRAP CLASS II <br />$98.13 <br />42 <br />CU YD <br />$4,121.46 <br />0 <br />CU YD <br />$0.00 <br />0.00 <br />CU YD <br />$0.00 <br />44 <br />2521.602 <br />6" CONCRETE SPILLWAY SPECIAL <br />$213.32 <br />89 <br />EACH <br />$18,985.48 <br />0 <br />EACH <br />$0.00 <br />28.00 <br />EACH <br />$5,972.96 <br />45 <br />2531.501 <br />CONCRETE CURB & GUTTER DESIGN B618 <br />$10.61 <br />26613 <br />LIN FT <br />$282,363.93 <br />634 <br />LIN FT <br />$6,726.74 <br />9,868.00 <br />LIN FT <br />$104,699.48 <br />46 <br />2531.501 <br />CONCRETE CURB & GUTTER DESIGN B818 MEDIAN <br />$10.61 <br />760 <br />LIN FT <br />$8,063.60 <br />0 <br />LIN FT <br />$0.00 <br />0.00 <br />LIN FT <br />$0.00 <br />47 <br />2531.503 <br />CONCRETE MEDIAN 5" <br />$38.40 <br />96 <br />SQ YD <br />$3,686.40 <br />0 <br />SQ YD <br />$0.00 <br />0.00 <br />SQ YD <br />$0.00 <br />48 <br />2531.507 <br />CONCRETE DRIVEWAY PAVEMENT 7" <br />$43.20 <br />1897 <br />SQ YD <br />$81,950.40 <br />447.93 <br />SQ YD <br />$19,350.58 <br />508.43 <br />SQ YD <br />$21,964.18 <br />49 <br />2531.604 <br />CONCRETE MEDIAN NOSE - SPECIAL <br />$57.60 <br />42 <br />SQ YD <br />$2,419.20 <br />0 <br />SQ YD <br />$0.00 <br />0.00 <br />SQ YD <br />$0.00 <br />50 <br />2531.604 <br />7" CONCRETE VALLEY GUTTER <br />$57.60 <br />40 <br />SQ YD <br />$2,304.00 <br />56.2 <br />SQ YD <br />$3,237.12 <br />56.20 <br />SQ YD <br />$3,237.12 <br />