My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.1. SR 08-25-2004
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2004
>
08/25/2004 - SPECIAL/JOINT
>
2.1. SR 08-25-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:33:55 AM
Creation date
8/20/2004 1:45:32 PM
Metadata
Fields
Template:
City Government
type
SR
date
8/25/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TO: <br /> <br />FROM: <br /> <br />DATE: <br /> <br />SUBJECT: <br /> <br /> MEMORANDUM <br /> <br />Pat Klaers, City Administrator <br />Terry Maurer, City Engineer ~1~ <br /> <br />August 18, 2004 <br /> <br />Trunk Highway 10 Street Lights <br /> <br />Back in March of 2004, I made contact with Mn/DOT regarding the street lights between <br />Proctor and Main Street on Trunk Highway 10. At that time, I forwarded to you a copy of <br />the original Agreement No. 62187, which requires the city to be responsible for a <br />replacement of these street lights. I forwarded copies of emails from Mn/DOT employees <br />who were asked to inspect and comment on the condition of the lights. <br /> <br />Most recently, I have had conversations with Tom Dumont, Mn/DOT District 3Assistant <br />Traffic Engineer, regarding street light replacement cost estimates. Tom has located the <br />original construction plans which show 18 double-luminair light standards and 8 single- <br />luminair light standards for a total of total of 26, which were installed with the original <br />construction. Tom has also had a conversation with Dave Scott from the Mn/DOT Central <br />Office who deals directly with the design and installation of lighting systems. Based on <br />Tom's discussions with Dave, he was able to provide me with the following replacement <br />construction cost estimates: <br /> <br />· Replacement of the light standards only would mn approximately $2,200-$2,500 each. <br />· The existing bases and anchor boks could be ultrasonic-tested to determine whether they <br /> are in adequate condition to support a new light standard into the future. <br />· If the anchor boks are not in adequate condition for new light standards to be placed <br /> upon them, the cost to remove the foundations is approximately $200 each, and the <br /> replacement cost for a new foundation including new anchor boks, would be <br /> approximately $450 each. <br />· The original wiring is placed in a rigid steel conduit and may be adequate for usage on <br /> into the future. If the wiring needs to be replaced, it will likely be able to be replaced in <br /> the existing conduit. Tom didn't have an estimate of what the wiring replacement cost <br /> would be. <br />· Given the location of the lights, it will be necessary to dose a lane in each direction along <br /> Trunk Highway 10 while construction is taking place. The cost for lane closures is <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.