My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10.1. SR 09-08-2015
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2015
>
09-08-2015
>
10.1. SR 09-08-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2015 8:23:01 AM
Creation date
9/4/2015 8:21:15 AM
Metadata
Fields
Template:
City Government
type
SR
date
9/8/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sections will also be developed to incorporate the design into the upcoming 2016 park <br /> improvement project. <br /> Task 6—Construction Administration <br /> c. Review and approval of shop drawing submittals for dock,gangway, and achorage <br /> system <br /> d. Construction observation of the proposed stairway/gangway/dock installation and <br /> related site work <br /> e. Review and administer pay requests and forward to City for payment as part of the phase <br /> one project <br /> f. Coordinate as-builts with selected contractor as part of project closeout <br /> This proposal is based on the following assumptions: <br /> 1. Dock system is provided by MINNCOR Industries (a DNR approved vendor). Other vendors may <br /> need additional review time/tasks <br /> 2. The dock system is intended to be seasonal with removal in the late fall <br /> 3. Structural engineering of any required foundations or anchor systems is not included in the <br /> basic tasks (detailed engineering is proposed as future task 5). This service, if required,will be <br /> estimated once a design has been established <br /> 4. A USACE Section 10 Permit is assumed to not be required. If required,this may be a time <br /> consuming task. See description above for additional information <br /> 5. A DNR permit is not required. <br /> 6. Legal review of potential liability exposure is not in this scope, and is assumed to be done <br /> concurrently by City staff <br /> 7. Coordination with FEMA, if required, is not part of this scope <br /> Proposed Design and Engineering Fees: <br /> Due to the undetermined nature of the final design of the access stair/gangway/dock,the HKGi team <br /> proposes to include tasks 1 through 4 as an initial step in determining the viability/feasibility of the dock <br /> design and as a means of providing a more realistic design prior to determining the scope for tasks 5 and <br /> 6. <br /> Tasks 1 through 4 will provide enough background and preliminary design to accurately determine the <br /> cost and feasibility of the dock and related access. <br /> The HKGi team proposes to accomplish Tasks 1 through 4 of the above described scope for a fee of <br /> $8,700. <br />
The URL can be used to link to this page
Your browser does not support the video tag.