My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.2. SR 08-16-2004
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2004
>
08/16/2004
>
6.2. SR 08-16-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:33:54 AM
Creation date
8/13/2004 1:03:23 PM
Metadata
Fields
Template:
City Government
type
SR
date
8/16/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Howard R, Green Oompany <br /> <br />July 14, 2004 <br /> <br />File: 823910J-0240 <br /> <br />Mr. Chris Leeseberg: <br />City of Elk River <br />13065 Orono Parkway <br />Elk River MN 55330 <br /> <br />Re: ABRA Auto Body Ske Plan <br /> <br />Dear Mr. Leeseberg: <br /> <br />As requested, we have reviewed the site plan submittal for the ABRA Auto Body <br />development in The Pines Town Office Park. As you are aware, this is located on 18Ya <br />Circle Ora Street) east of Line Avenue. The submittal was prepared by Atliant Engineering, <br />Inc. of Minneapolis. Based on our review, we would offer the following comments: <br /> <br />A. Final Plat <br /> <br />In order to create the building site for ABRA Auto Body, it is proposed to replat <br />Oudot A of The Pines Town Office Park into Lot 1, Block 1 for the ABRA ske, <br />with the remnant being called Outlot A, of The Pines Town Office Park Third <br />Addition. The new plat adds to the existing 75-foot drainage and utility <br />easement along the Line Avenue frontage. The total wi&h of the drainage and <br />utility easement dedicated along the Line Avenue frontage is 90 feet. However, <br />the grading plan shows an expansion of the existing ponding area to a width of <br />approximately 130-135 feet at the north end and approximately 115-120 feet at <br />the south end. The overall dedicated &ainage and utility easement needs to be <br />large enough to encompass the entire pond/ng area. <br /> <br />B. Grading Plan <br /> <br />The Elk River design standards require pond slopes to be 4:1 above the high <br />water level. The slope between the parking area and the pond is approximately <br />2:1. This pond slope on the expanded ponding area needs to be flatter. The <br />dedicated drainage and utility easement referred to in the item above needs to be <br />widened to encompass the entire ponding area. <br /> <br />2550 University Avenue West · Suite 400N ° St. Paul, MN 55114 · 651/644-4389 fax 651/644-9446 toll free 888/368-4389 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.