My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-30-1995 HR MIN
ElkRiver
>
City Government
>
Boards and Commissions
>
Housing & Redevelopment Authority
>
HRA Minutes
>
1990-1999
>
1995
>
06-30-1995 HR MIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2015 11:06:53 AM
Creation date
9/3/2015 11:06:53 AM
Metadata
Fields
Template:
City Government
type
HRM
date
6/30/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COSTS ASSOCIATED WITH THE 1995 MINNESOTA CITY PARTICIPATION PROGRAM. • <br /> COMMISSIONER KROPUENSKE SECONDED THE MOTION. THE MOTION CARRIED 4-0. <br /> 5. Review Preliminary Parking Lot Design <br /> At this time, HRA Commissioners reviewed a preliminary design for the parking lot <br /> improvements relating to the city-owned lot behind Champion Auto and <br /> Johnson's Family Apparel in downtown Elk River. Commissioners noted the need <br /> for a pedestrian/handicap cut from the sidewalk along US Highway 10 into the <br /> parking lot. In addition, Commissioners suggested that Elk River Meats review the <br /> proposed curbed island which may affect delivery trucks. <br /> 6. Adjournment <br /> There being no further business, the meeting of the Elk River HRA adjourned at <br /> 7:50 a.m. <br /> Respectfully submitted, <br /> � � <br /> iWi(liam Rubin <br /> HRA Executive Director <br /> III <br />
The URL can be used to link to this page
Your browser does not support the video tag.