Laserfiche WebLink
WCA Replacement Plan Application <br />Trout Brook Estates <br />June 28, 2004 <br />Page 6 <br /> <br />The total eligible wetland mitigation credits being generated are outlined in the <br />table below. <br /> <br />Table 1. WCA Wetland Credits - Long Acres <br /> <br />Mitigation Area Mitigation Acreage Used By To Be <br /> Type Project Banked <br />North of Wetland 1 NWC 1.00 acre 1.00 acre 0.0 acre <br />(east basin) <br />North of Wetland 1 NWC 0.66 acre 0.66 acre 0.0 acre <br />(west basin) <br />South of Wetland 1 NWC 0.05 acre 0.05 acre 0.0 acre <br />Southeest of Wetland 3 NWC 0.22 acre 0.22 acre 0.0 acre <br />Buffer at Wetland 1 PVC 1.71 acre 1.71 acre 0.0 acre <br />Buffer at Wetland 3 PVC 0.22 acre 0.22 acre 0.0 acre <br />TOTAL 3.86 acres 3.86 acres 0 acres <br /> <br />Monitoring <br /> <br />The mitigation monitoring requirements outlined in the Wetland Conservation Act <br />will be followed. These requirements (per Minn. Rule 8420.0620) are as follows: <br /> <br />1) <br /> <br />2) <br /> <br />3) <br /> <br />4) <br /> <br />5) <br /> <br />Description of the project location, size, current wetland type (Cowardin <br />classification), and desired wetland type (goal). <br />A comparison of the as-built specifications versus the design <br />specifications (first annual monitoring report only) and a rationale for <br />significant changes. <br />Hydrology measurements: seasonal water level elevations or areal <br />coverage measurements during the period April through October. <br />A map of plant communities within the boundaries of the replacement site, <br />including hydrologic indicators observed. <br />Color photographs of the project area taken any time during the growing <br />season. <br /> <br />Annual mitigation monitoring reports will be submitted to the City of Elk River as <br />required in its replacement plan approval. <br /> <br /> <br />