My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.2. - 6.4. SR 07-19-2004
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2004
>
07/19/2004
>
6.2. - 6.4. SR 07-19-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:33:53 AM
Creation date
7/20/2004 12:31:38 PM
Metadata
Fields
Template:
City Government
type
SR
date
7/19/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Michele McPherson <br />June 17, 2004 <br />Page Two <br /> <br />Becker Trail is shown ending in a cul-de-sac approximately 850 feet west of <br />Trott Brook. The FEMA floodway for the portion of Trott Brook adjacent to <br />Outlot G is relatively narrow in this area (approximately 100 feet). This appears <br />to be a good location for a road crossing, based on the narrow floodway and <br />relatively high ground approaching this point from the west. This could provide a <br />potential connection between the Becker property and the Miske and Riverside <br />Development property lying to the west. This location is approximately halfway <br />between CSAH 13 and CSAH 12. A connection in this location would make <br />maintenance activities and emergency vehicle access much better. <br />Consideration should be given to providing road access in Trout Brook Estates <br />further to the west and to require the developers to pay their fair share of the <br />Trott Brook crossing at a future date. <br />The grading plan shows a ten-foot bituminous trail from the south end of Becker <br />Trail to Outlot G, extending southerly into Trott Brook Farms, then westerly to <br />the cul-de-sac of Street E. There are two locations where retaining walls are <br />shown adjacent to the trail. It appears the height of the retaining walls will be <br />approximately two to four feet. This raises various questions. Who will own and <br />maintain these retaining walls? What kind of protection will be placed on the <br />edge of the trail to preclude people from leaving the trail and falling off the <br />retaining wall? The type of protection utilized should not reduce the usable <br />width of the trail. If necessary, the trail should be widened slightly in these <br />locations. <br />The grading plan should identify the top of berm elevations for the proposed <br />ponds. This elevation must be a minimum of one foot above the one hundred <br />year HWL for the pond. <br />The grading plan should show the FEMA flood elevation along the eastern edge <br />of the proposed development. <br />The grading plan should show the drainage easements for the proposed ponds <br />and wetlands. <br /> <br />C. Street <br /> · <br /> <br />and Utility Plans <br />The following lots appear to be too Iow for the proposed sanitary sewer <br />elevations: Lots 10 and 11, Block 19; Lots 1, 2, and 3, Block 20. <br />The development includes the construction of a lift station near Lot 1, Block 4; <br />no details other than the general depth have been provided at this time. As this <br />project proceeds to final plans and specifications, this lift station must be built in <br />accordance with City standards. <br />The proposed street section shown on plans has a width of 30 feet from back of <br />curb to back of curb. The City standard is 32 feet wide from face of curb to face <br />of curb. The street section needs to be changed to reflect City requirement. <br />Watermain needs to be looped through Outlot I in the southeast corner of the <br />development. This is the same location as the proposed road connection <br />crossing Trott Brook to the properties to the east. <br />The plans show connecting to trunk watermain on Twin Lakes Road. However, <br />that watermain is noted in the plans as to be constructed by others. This <br />watermain loop must be constructed as part of this project by this developer. <br />Hydrant placement and valve location throughout the development will be <br />reviewed in detail when final construction plans are submitted. <br /> <br />S:~°LANNING\Case Files~004\P 04-08 Trout Brook Estates\6 16 04 TM Memo.doc <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.