Laserfiche WebLink
SPEC. <br />REF. <br /> <br />DESCRIPTION <br /> <br /> CONTRACT ITEMS I <br />UNIT QTY. UNIT QTY. <br /> PRICE <br /> <br />THIS PERIOD <br /> <br /> AMOUNT <br /> <br />TOTAL TO DATE <br /> <br /> AMOUNT <br /> <br /> 0 <br /> <br />112 <br />113 <br /> <br />114 <br />115 <br /> <br />116 <br />117 <br />118 <br /> <br />119 <br />120 <br />121 <br />122 <br />123 <br />124 <br />125 <br />126 <br /> <br />127 <br /> <br />2564.603 <br />2564.603 <br />2564.603 <br />2564.604 <br /> <br />2565.602 <br />2565.603 <br /> <br />2573.501 <br />2573.502 <br />2573.602 <br /> <br />2575.501 <br />2575.502 <br />2575.502 <br />2575.505 <br />2575.511 <br />2575.519 <br />2575~523 <br />2575.531 <br /> <br />2580.501 <br /> <br />100 mm DOUBLE SOLID LINE YELLOW - EPOXY <br />600 mm STOP LINE WHITE - POLY PREFORMED <br />600 mm SOLID LINE YELLOW - EPOXY <br />CROSSWALK MARKING - EPOXY <br /> <br />PVC HANDHOLE (METAL FRAME AND COVER) <br />103 mm RIGID STEEL CONDUIT <br /> <br />BALE CHECK <br />SILT FENCE TYPE HEAVY DUTY MAINTAINED <br />TEMPROARY ROCK CONSTUCTION ENTRANCE <br /> <br />SEEDING <br />SEED MIXTURE 50A <br />SEED MIXTURE 65A <br />SODDING <br />MULCH MATERIAL TYPE 1 <br />DISK ANCHORING <br />EROSION CONTROL BLANKET, CATEGORY 3 <br />COMMERCIAL FERT ANALYSIS 10-20-20 <br /> <br />TEMPORARY LANE MARKING <br /> <br />m I 192 $2.20 0.00 $0.00 0.00 $0.00 <br />m 85 $38.00 0.00 $0.00 0.00 $0.00 <br />m 40 $15.00 0.00 $0.00 0.00 $0.00 <br />m2 32 $52.00 0.00 $0.00 0.00 $0.00 <br /> <br />EA 4 $519.00 1.00 $519.00 1.00 $519.00 <br />m 150 $50.00 0.00 $0.00 0.00 $0.00 <br /> <br />EA 100 $7.00 0.00 $0.00 0.00 $0.00 <br />m I 500 $6.10 0.00 $0.00 0.00 $0.00 <br />EA 1 $650.00 0.00 $0.00 0.00 $0.00 <br /> <br />ha 22 $490.00 0.00 $0,00 0.00 $0.00 <br />kg 900 $8.80 0.00 $0.00 0.00 $0.00 <br />kg 400 $5.50 0.00 $0.00 0.00 $0.00 <br />m2 21 100 $2.05 0.00 $0.00 0.00 $0.00 <br />t 105 $165.00 0.00 $0.00 0,00 $0.00 <br />ha 22 $122.00 0.00 $0.00 0.00 $0.00 <br />m2 700 $1.80 Q00 $0.00 0,00 $0.00 <br />t 11 100 $0.30 0.00 $0.00 0.00 $0.00 <br /> <br />m 6 900 $0.80 0.00 $0.00 0.00 $0.00 <br /> <br />TOTAL BID SUMMARY THIS PERIOD <br />TOTAL BID SUMMARY TO DATE <br /> <br />AMOUNT EARNED <br /> <br />AMOUNT RETAINED <br /> <br />MATERIAL ON SITE <br /> <br />MATERIAL DEDUCT. <br /> <br />PREVIOUS PAYMENTS <br /> <br />AMOUNT DUE <br /> <br />TOTAL THIS PERIOD <br /> <br />$186,219.92 <br /> <br />$186,219.92 <br /> <br /> $9,311.00 <br /> $0.00 <br /> $0.00 <br /> <br />$176.908.92 <br /> <br />TOTAL TO DATE <br /> <br /> $2,187,979.75 <br /> <br /> $109.399.00 <br /> $0,00 <br /> <br /> $0.00 <br /> $1,901,671.83 <br /> <br /> $176,908.92 <br /> <br />$2,187,979.75 <br /> <br />o:\proj\~O110.1~0081~Tylcr Payest #6 PAGE 3 <br /> <br /> <br />