My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2. SR 09-11-2000
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2000
>
09/11/2000
>
5.2. SR 09-11-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:33:52 AM
Creation date
7/12/2004 7:22:18 PM
Metadata
Fields
Template:
City Government
type
SR
date
9/11/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of <br /> <br />River <br /> <br />MEMORANDUM <br /> <br />Item #5.2. <br /> <br />TO: <br /> <br />FROM: <br /> <br />DATE: <br /> <br />Mayor and Council <br />Pat Klaers, City Admini~;~t~ <br /> <br />September 11, 2000 <br /> <br />SUBJECT: YMCA Feasibility Study <br /> <br />As previously reviewed with the City Council, the city and representatives of <br />the YMCA have been discussing the possibility of bringing a YMCA facility to <br />the community. The first step in this process is to conduct a market feasibility <br />study in order to determine such things as potential membership, preferred <br />siting, and desired programs. This market feasibility study does not deal with <br />capital funding issues. <br /> <br />The Board of Directors of the YMCA of Metropolitan Minneapolis has <br />authorized the YMCA to equally share the cost of a market feasibility study <br />with the City of Elk River. Details on the feasibility study proposal are <br />expected on Thursday, September 7, and may or may not make it into the <br />packet. (The packets will be completed on Thursday due to work and staffing <br />issues related to the September 12 primary election.) <br /> <br />The council previously discussed funding its share of the feasibility study in <br />2000 by using the city council contingency fund. The feasibility study will take <br />three or four months and results will not be available until early 2001. <br />Originally it was assumed that the maximum cost for a feasibility study was in <br />the $30,000 range and, if this holds true, our share would be up to $15,000. <br /> <br />13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · TDD & Phone (763) 441-7420 · Fax (763) 441-7425 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.