Laserfiche WebLink
Mr. Steve Wensman <br />July 13, 2000 <br />Page Three <br /> <br />into the pond. We would suggest that catch basins be placed on the culvert <br />under the road as a method to convey drainage from the access road to the <br />pond. <br />Bruce West, Fire Chief, indicated at the staff review meeting that the size of the <br />Phase II building will require a fire lane around its perimeter. This fire lane <br />should be planned for in the development and grading of the site. <br />No septic system calculations have been submitted at this time. These <br />calculations need to be submitted, reviewed, and approved prior to construction. <br /> <br />If you have any questions regarding any of these comments, please call. <br /> <br />Sincerely, <br /> <br />Howard R. Green Company <br /> <br />TJM/mjw <br /> <br />Ltr-071200-Wensman.doc <br /> <br />Howard R. Green Company <br /> CONSULTING ENGINEERS <br /> <br /> <br />