My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.7.C. SR 08-14-2000
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2000
>
08/14/2000
>
5.7.C. SR 08-14-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:33:50 AM
Creation date
6/28/2004 7:30:53 PM
Metadata
Fields
Template:
City Government
type
SR
date
8/14/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
80710 <br /> <br />100 Percent shall be the rate of cost participation in all of the <br />Trunk Highway No. 10 construction and its frontage road center 24' of <br />roadway, curb and gutter and island construction as shown and/or <br />described in "Blue" on EXHIBIT "Cost Participation", which is on file <br />at the locations given in Section A. of this article. The <br />construction includes, but is not limited to, those construction <br />items as described and tabulated on Sheets No. 2 and No. 3 of the <br />attached Preliminary SCHEDULE "I" <br /> <br />60 Percent shall be the rate of cost participation in all of the <br />concrete walk construction as shown and/or described in "Orange" on <br />the EXHIBIT "Cost Participation", which is on file at the locations <br />given in Section A. of this article. The construction is the <br />construction item for 4" concrete walk as described and tabulated on <br />Sheet No. 2 of the attached Preliminary SCHEDULE "I" <br /> <br />50 Percent shall be the rate of cost participation in all of the <br />bituminous trail construction as shown and/or described in "Green" on <br />the EXHIBIT "Cost Participation", which is on file at the locations <br />given in Section A. of this article. The construction is the <br />construction item for bituminous wearing course mixture (trail) as <br />described and tabulated on Sheet No. 2 of the attached Preliminary <br />SCHEDULE "I" <br /> <br />Section C. Construction Engineering Costs <br /> <br />The State shall pay a construction engineering charge in an amount <br />equal to 8 percent of the total cost of the State participation <br />construction covered under this Agreement. <br /> <br />Section D. Addenda, Change Orders and Supplemental Agreements <br /> <br />The State shall share in the costs of construction contract addenda, <br />change orders and/or supplemental agreements which are necessary to <br />complete the State cost participation construction covered under this <br /> <br />7 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.