My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.5. SR 08-14-2000
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2000
>
08/14/2000
>
5.5. SR 08-14-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:33:50 AM
Creation date
6/28/2004 7:30:07 PM
Metadata
Fields
Template:
City Government
type
SR
date
8/14/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.10 Review, for conformance with the System Plan, and approve, disapprove or <br /> modify plans for commuter rail-related facilities, including stations, park-and- <br /> ride lots and interfaces to other modes of transit. <br />2.11 Monitor work conducted by NCDA so that corridor planning, design and <br /> construction is consistent with system integration, and to ensure that it is in <br /> compliance with federal funding requirements. <br />2.12 Appoint members to the Commuter Rail Steering Committee, as provided in <br /> Article 4 of this agreement. <br />2.13 Disburse grant funds received by Mn/DOT on behalf of NCDA. <br /> <br />3. Duties Of NCDA <br />NCDA duties and responsibilities, in cooperation with and under the supervision of <br />Mn/DOT, are to: <br /> 3.1 Conduct all activities in a manner designed to produce an integrated <br /> commuter rail system and to ensure continuing eligibility for federal funding.' <br /> 3.2 Permit a designated Mn/DOT official to serve in a non-voting advisory <br /> capacity on NCDA's "Executive Committee ", or equivalent policy <br /> committee, responsible for planning and development of commuter rail. <br /> 3.3 Permit a designated Mn/DOT official to serve in a non-voting advisory <br /> capacity on NCDA's "Technical Advisory Committee ", or equivalent <br /> technical committee, responsible for overseeing the engineering, <br /> specifications and other technical aspects of commuter rail <br /> 3.4 Conduct feasibility studies, planning, preliminary engineering, final design, <br /> construction, operational planning and planning of related facilities. <br /> 3.5 Adhere to the guidance, requirements and specifications of the System Plan <br /> in conducting all commuter rail activities, unless a variance from such <br /> guidance, requirements and specifications in expressly granted in writing by <br /> Mn/DOT. <br /> 3.6 Include and utilize data, planning standards and forecasting models provided <br /> by Mn/DOT" <br /> 3. ? A~er completing each stage of the development process, request and receive <br /> written approval from Mn/DOT before advancing to the next stage. <br /> 3.8 Prior to executing any sub-consultant agreement, request and receive <br /> Mn/DOT's written approval of the proposed a~reement. <br /> 3.9 Participate in negotiations with railroads at the request of Mn/DOT. <br /> 3.10 Appoint a member to the Commuter Rail Steering Committee as provided <br /> in Article 4 of this agreement <br /> 3.11 Request Mn/DOT's written approval before varying from any of the duties <br /> set out in this agreement. <br /> <br />4. Commuter Rail System Steering Committee <br />4.1 Mn/DOT has established and utilized the Commuter Rail System Steering <br /> Committee ("Committee') to develop the system plan. As recommended in <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.