Page 2 <br />Regular Meeting of the Elk River Municipal Utilities Commission <br />J~ly...11, 2000 <br /> <br /> Due to the low bids, Staff recommended doing the complete project, instead of <br />the partial option, and completing the project in approximately two years through side <br />streets. <br /> John Dietz reported on the considerations of the City Council regarding the <br />project, as well as further information about Main Street Parking. <br /> <br />James Tralle moved to proceed with all of the watermain improvements, <br />'--awarding'fi~bid to' Hardrives,~I~e.-at a~totat tcos't to"the Utilities'of' $312,2 t'1.96-Tot the <br /> watermain component of the original bid, with contingency construction engineering, and <br /> field engineering to be added to total $365,000.00 for the project. George Zabee <br /> seconded the motion. Motion carded 3-0. <br /> <br />5.2 Review and Consider Wind Energy Program <br /> <br /> Bryan Adams reported on the wind generation program titled "Wellspring" <br />offered by Great River Energy. The "Wellspring" Program is being offered to ask <br />customers to become green energy pioneers by making a commitment to purchase wind <br />energy at an additional cost. The cost to customers would be at a rate of $2.00/100 kwh <br />block. <br /> <br /> George Zabee moved to limit the participation by the Elk River Municipal <br />Utilities to offering brochures outlining the plan, and to enclose them as a stuffer in a <br />monthly billing. James Tralle seconded the motion. Motion carried 3-0. <br /> <br />~ 5.,3_l~g.v. jg~F.g.a,~2lllly_$.[u_dy f~L~.dLed3LArea ImplzO_V_el~ents2hase IV <br /> <br /> The Amended Feasibility Study for the Western Area Improvements was <br />presented and reviewed. The Study reflects a modified design that leaves 185th Avenue <br />unaffected. The water portion of this project will be paid through trunk assessments and <br />assessments to Hoyt Partners. No contribution from the Elk River Municipal Utilities <br />will be required. Construction is to be completed by Spring 2001. <br /> John Dietz added comments regarding City Council considerations on the last <br />phase in the western area of the City. <br /> <br /> <br />