Laserfiche WebLink
14. <br /> <br />15. <br /> <br />16. <br /> <br />17. <br /> <br />18. <br /> <br />19. <br /> <br />20. <br /> <br />21. <br /> <br />22. <br /> <br />23. <br /> <br />24. <br /> <br />25. <br /> <br />26. <br /> <br />27. <br /> <br />28. <br /> <br />PARK DEDICATION FEE AND TRAIL FEE IN THE AMOUNT REQUIRED <br />BY THE CITY AT THE TIME OF FINAL PLAT BE PAID PRIOR TO <br />RELEASING THE PLAT FOR RECORDING WITH SHERBURNE COUNTY. <br /> <br />THAT AN EASEMENT BE PROVIDED FOR A CITY TRAIL AS <br />RECOMMENDED BY THE PARK AND RECREATION COMMISSION OVER <br />THE EAST AND WEST TRAILS TO ALLOW PUBLIC ACCESS. <br /> <br />THAT THE TRAIL / FIRE LANE BE DESIGNED AND CONSTRUCTED AS <br />APPROVED BY THE FIRE CHIEF INCLUDING A BREAK-AWAY BARRIER <br />APPROVED BY THE POLICE AND FIRE CHIEF'S. <br /> <br />THAT THE CITY ENGINEER'S COMMENTS BE INCORPORATED INTO <br />THE PRELIMINARY PLAT AND SITE PLANS. <br /> <br />THAT ALL LANDSCAPED AREAS BE IRRIGATED. <br /> <br />THAT PHASE TWO BE CONTINGENT ON THE RECOMMENDATIONS OF <br />THE TECH PANEL AND ARMY CORPS OF ENGINEER REVIEWS. <br /> <br />THAT THE DEVELOPER OBTAINS WRITTEN APPROVAL FROM THE <br />UTILITIES TO GRADE IN THE GAS AND POWER LINE EASEMENTS. <br /> <br />THAT THE PARKING AND PAVEMENT BE REMOVED FROM THE 6TM <br />STREET BOULEVARD WHERE DISRUPTED BY UTILITY WORK AND <br />RESTORED WITH TURF. <br /> <br />THAT ANY PROPOSED DEVELOPMENT SIGNS BE SHOWN ON THE <br />DEVELOPMENT PLANS AND THAT A SIGN PERMIT BE OBTAINED FROM <br />THE CITY PRIOR TO INSTALLATION OF ANY SIGNS. <br /> <br />THAT THE PRIVATE ROADS BE RESTRICTED TO PARKING ON ONE SIDE <br />OF THE STREET WITH SIGNS INDICATING NO PARKING. <br /> <br />THAT ANY TREES ON OR OFF SITE, NEAR THE LIMIT OF GRADING, <br />THAT ARE TO BE PROTECTED, BE FENCED WITH A SNOW FENCE <br />PRIOR TO TREE REMOVAL OR CONSTRUCTION OF THE PUBLIC <br />IMPROVEMENTS AT THE DRIPLINE TO PREVENT DAMAGE TO TREES <br />BY INADVERTENT GRADING, EROSION, SOIL COMPACTION AND <br />STORAGE OF DEBRIS OR EQUIPMENT IN THE TREES. <br /> <br />THAT RIGHT-OF-WAY BE GRANTED FOR THE LINE AVENUE CUL-DE- <br />SAC. <br /> <br />THAT THE DEVELOPER OBTAINS WRITTEN APPROVAL FROM THE <br />UTILITIES TO GRADE IN THE GAS AND POWER LINE EASEMENTS. <br /> <br />THAT THE PARKING AND PAVEMENT BE REMOVED FROM THE 6TM <br />STREET BOULEVARD WHERE DISRUPTED BY UTILITY WORK AND <br />RESTORED WITH TURF. <br /> <br />THAT ANY PROPOSED DEVELOPMENT SIGNS BE SHOWN ON THE <br />DEVELOPMENT PLANS AND THAT A SIGN PERMIT BE OBTAINED FROM <br />THE CITY PRIOR TO INSTALLATION OF ANY SIGNS. <br /> <br />S:\DOCUMENT~RESOLUTI\P00-7.DOC Page 7 <br /> <br /> <br />