Laserfiche WebLink
· ~~'~5.). As incentive for these buildings to be constructed and remain affordable in today's <br /> ~~competitiveS , to:: markets of various cities, we are requesting the EDA, at the EDA's expense, <br /> . _~ A. Subdivide the subject property into two separate parcels of record and of <br /> approximately equal size. <br /> ~~:}:B. Deed the subdivided parcels to the building owners free and clear of any <br /> ~~?ncumbrances and at no cost to the owners. <br /> <br /> :' '~ 6" 6" <br /> .~. Provide a water main and sewer main to each parcel at the Joplin Street <br /> line. r <br /> <br /> ~'Provide access to the storm sewer system now located along Joplin Street N.W. and <br /> 8:~'~-d Avenue N.W. as determined and calculated by the City Engineer. <br /> <br /> '~'~E~. Vacate the existing drainage and utility easement now located in the southeast comer <br /> ~ofthe subject property. <br /> <br />time line for this project is critical due to the time restrictions involved with the IRS <br />>roperty exchange requirement; both parties are doing an exchange. For that reason, we <br />would need all required public hearings to be completed on or before the September 18th <br />City Council meeting. <br /> <br />Unresolved concerns at this point are limited to the site soil conditions and the status and <br /> of the approximate 8,000 to 10,000 cubic yards of dirt that was deposited on this <br /> Lake dredging. <br /> <br /> fees and the availability of 208 volt 3 phase <br /> <br />to attend the EDA meeting this coming Monday, <br /> <br /> <br />