My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.5. SR 08-17-2015
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2015
>
08-17-2015
>
4.5. SR 08-17-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2015 3:42:08 PM
Creation date
8/13/2015 3:27:53 PM
Metadata
Fields
Template:
City Government
type
SR
date
8/17/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
***** MAINTABQPROPRIETARYCONFIDENTIALITY ***** <br />BNSF RAILWAY COMPANY <br />FHPM ESTIMATE FOR <br />CITY OF ELK RIVER <br />LOCATION EAST ELK RIVER DETAILS OF ESTIMATE PLAN ITEM : 227559000 VERSION: 2 <br />PURPOSE, JUSTIFICATION AND DESCRIPTION <br />PIP - ICE DIV STAPLES SUB LS 25 MP 34.51 - DOT #082936Y - 100% BILLABLE TO CITY OF ELK RIVER <br />CROSSING BEING EXTENDED ON EACH MAIN TO ACCOMMODATE FOR WIDER ROADWAY. INSTALL [4] 40FT TRACK PANELS WITH LOFT <br />TIES, 150NT OF BALLAST, [41136/115 TRANSITION RAILS, AND [2] 48TF CONCRETE CROSSINGS. <br />REQUESTED BY PATRICK PHILIP HOSKINS 5/1/15 <br />REVISION REQUESTED BY ANDREW WORDEKEMPER 6/9/15 <br />PRIMARY FUNDING SOURCE IS FHWA <br />**BUY AMERICA(I) APPLIES ** <br />DESCRIPTION QUANTITY U/M COST TOTAL S <br />kkkkkkkkkk <br />LABOR <br />kkkkkkkkkk <br />PLACE FIELD WELDS - CAP <br />REPLACE PUBLIC CROSSING - TOTAL REHAB <br />SURFACE TRACK - REPLACEMENT -CAP <br />UNLOAD BALLAST - REPLACEMENT - CAP <br />UNLOAD CROSSING MATERIAL - PUBLIC - CAP <br />PAYROLL ASSOCIATED COSTS <br />DA OVERHEADS <br />EQUIPMENT EXPENSES <br />INSURANCE EXPENSES <br />TOTAL LABOR COST <br />kkkkkkkkkkkkk <br />MATERIAL <br />kkkkkkkkkkkkk <br />BALLAST, FOR GENERIC USE ONLY <br />TRACK PANEL, 136 STANDARD RAIL, 80 FT - 10 FT TIES - <br />RAIL, TRANSN,BE,40 FT,136 - 1/4 WORN 132 <br />SPIKE, TBR SCREW 3/4"X13", F/ROAD XING <br />WELDKIT, GENERIC FOR ALL RAIL WEIGHTS <br />CONC 136 08 -SEC WITH FILLER FOR 10' WOOD TIES ** <br />CONCRETE XING RAMP AND PANEL RESTRAINT, <br />MATERIAL HANDLING <br />ONLINE TRANSPORTATION <br />USE TAX <br />OFFLINE TRANSPORTATION <br />TOTAL MATERIAL COST <br />kkkkkkkkkk <br />OTHER <br />kkkkkkkkkk <br />TOTAL OTHER ITEMS COST <br />PROJECT SUBTOTAL <br />CONTINGENCIES <br />BILL PREPARATION FEE <br />GROSS PROJECT COST <br />LESS COST PAID BY BNSF <br />TOTAL BILLABLE COST <br />Page 2 of 2 <br />184.0 MH <br />5,395 <br />96.0 MH <br />2,665 <br />24.0 MH <br />695 <br />10.0 MH <br />278 <br />48.0 MH <br />1,333 <br />EA ** <br />6,837 <br />23.0 <br />8,655 <br />1,560 <br />5,627 <br />FT ** <br />1,737 <br />33,222 33,222 <br />160.0 <br />NT ** <br />1,402 <br />2.0 <br />EA ** <br />21,810 <br />8.0 <br />EA X <br />10,248 <br />216.0 <br />EA ** <br />486 <br />23.0 <br />KT ** <br />1,560 <br />96.0 <br />FT ** <br />15,312 <br />2.0 <br />ST ** <br />620 <br />2,570 <br />2,482 <br />3,883 <br />498 <br />60,871 60,871 <br />0 0 <br />9011 <br />104,136 <br />0 <br />104,136 <br />
The URL can be used to link to this page
Your browser does not support the video tag.