Laserfiche WebLink
Project: Wastewater Treatment Facility Improvements 2014 Owner: City of Elk River Application Number 9 <br />Contractor: Rice Lake Construction Group Date of application 7/3112015 <br />Engineer: Bolton & Menk, Inc. Work completed through: 7/31/2015 <br />Item <br />Pay Item Number Description <br />B <br />Scheduled Value <br />C <br />From Previous <br />Application (C+D) <br />D E <br />This Period Materials Presently <br />Stored (not in Col D) <br />Total Completed <br />and Stored to Date <br />(C + D + E) <br />% <br />(E) <br />Balance to <br />Finish <br />09310 <br />Ceramic/Resilient Tile <br />$30,000.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$30,000.00 <br />09510 <br />Acoustical Ceiling <br />$6,500.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$6,500.00 <br />09900 <br />Painting <br />$373,921.00 <br />$10,000.00 <br />$74,000.00 <br />$84,000.00 <br />22.46 <br />$289,921.00 <br />10110 <br />Marker Boards/Toilet Compartments/Toilet Accessories <br />10110.1 <br />-Purchase <br />$8,000.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$8,000.00 <br />10110.2 <br />-Install <br />$3,000.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$3,000.00 <br />10250 <br />Safety Devices <br />10250.1 <br />-Purchase <br />$10,000.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$10,000.00 <br />10250.2 <br />-Install <br />$3,500.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$3,500.00 <br />10505 <br />Metal Lockers <br />10505.1 <br />-Purchase <br />$10,000.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$10,000.00 <br />10505.2 <br />-Install <br />$4,000.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$4,000.00 <br />11280 <br />Hydraulic Gates <br />11280.1 <br />-Purchase <br />$50,000.00 <br />$50,000.00 <br />$50,000.00 <br />100.00 <br />$0.00 <br />11280.2 <br />-Install <br />$20,000.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$20,000.00 <br />11311 <br />Submersible Centrifugal Pumps <br />11311.1 <br />-Purchase <br />$278,868.00 <br />$264,924.60 <br />$264,924.60 <br />95.00 <br />$13,943.40 <br />11311.2 <br />-Install <br />$25,000.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$25,000.00 <br />11345 <br />Chlorination & Dechlorination Eq. <br />11345.1 <br />-Purchase <br />$330,000.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$330,000.00 <br />11345.2 <br />-Install <br />$20,000.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$20,000.00 <br />11351 <br />Clarifier Equipment <br />11351.1 <br />-Purchase <br />$15,000.00 <br />$13,507.74 <br />$13,507.74 <br />90.05 <br />$1,492.26 <br />11351.2 <br />-Install <br />$12,000.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$12,000.00 <br />11356 <br />Screw Press <br />11356.1 <br />-Purchase <br />$575,000.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$575,000.00 <br />11356.2 <br />-Install <br />$25,000.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$25,000.00 <br />11374 <br />Fine Pore Aeration Equipment <br />11374.1 <br />-Purchase <br />$100,000.00 <br />$0.00 <br />$84,000.00 <br />$84,000.00 <br />84.00 <br />$16,000.00 <br />11374.2 <br />-Install <br />$75,000.00 <br />$0.00 <br />$15,000.00 <br />$15,000.00 <br />20.00 <br />$60,000.00 <br />11375 <br />Blower System (PD w/Enclosure) <br />11375.1 <br />-Purchase <br />$180,000.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$180,000.00 <br />11375.2 <br />-Install <br />$30,000.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$30,000.00 <br />Page 4 of 7 <br />