My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1.a. ERMUSR 08-11-2015
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2015
>
08-11-2015
>
6.1.a. ERMUSR 08-11-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2015 10:21:42 AM
Creation date
8/13/2015 9:50:22 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
8/11/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Our Resources <br /> VVPA met the 12% renewa ale <br /> energy sta nc a rc in 2014, <br /> Oak Glen Wind Farm Renewable Energy Credits <br /> The Oak Glen Wind Farm (OGWF) is a 44 MW MMPA purchases renewable energy credits <br /> wind project located near Blooming Prairie, (RECs) from a variety of renewable facilities <br /> Minnesota. The project is composed of 24 in Minnesota and the Midwest. These RECs <br /> turbines that produce renewable energy for are sourced from a variety of renewable <br /> the Agency. OGWF entered service in 2011 and technologies and supplement the Agency's <br /> has consistently had a high level of reliability. owned renewable generation. REC purchases <br /> The Agency installed a gazebo and educa give MMPA flexibility in meeting the Agency's <br /> tional signage about wind energy at a park in annual renewable energy requirements. <br /> Blooming Prairie in thanks to the community MISO <br /> for hosting the OGWF project. Like other utilities in the region, MMPA buys <br /> Hometown WindPower all of its load requirements from and sells all <br /> MMPA was the first municipal power agency in of its generation output to the Midcontinent <br /> the country with a wind turbine in each member Independent System Operator (MISO). However, <br /> community when it completed the Hometown MMPA's physical and contract assets provide <br /> WindPower project in 2010. A 160 kW wind caps on market prices. We also purchase both <br /> turbine was built in each member community, electricity and natural gas in forward markets. <br /> with a turbine also installed at the Agency's These hedging activities promote rate stability <br /> FEP facility. In addition to providing local and and manage MMPA's energy price risk. <br /> renewable energy, these turbines help <br /> community members learn about the benefits <br /> and operating characteristics of wind power. <br /> Purchases from Other Utilities <br /> The Agency purchases capacity from other <br /> utilities under short- and medium-term <br /> contracts when economic. These purchases <br /> allow MMPA to manage the timing of long-term <br /> Agency-owned resource additions. <br /> 2014 MMPA Annual Report 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.