Laserfiche WebLink
• Benzinger Properties has recently, and is continuing to install water main in the <br /> Prestigious Woodland Hills Development. Benzinger Properties is paying for 100% of <br /> the cost of installation. <br /> • When The City of Elk River developed Natures Edge Business Park,they paid for 100% <br /> of the water main installation in the Natures Edge Business Center. <br /> • The West Oaks, and Kliever Lake Fields Developments were installed entirely by the <br /> developer; they also continue to pay 100%of any changes to the water mains or services <br /> in the development due to lot changes. <br /> ACTION REQUESTED: <br /> The developer, Alex Bodnar,will be at the commission meeting. Staff requests the commission <br /> review the developer's request for the water main looping and extension variance. <br /> ATTACHMENTS: <br /> • ERMU Policy—5.2 Looping of Water Mains <br /> • ERMU Policy—5.0 Water Department Rules, Section 105 Main Extensions <br /> • Recommended Standards for Water Works—Section 8.2.4 Dead Ends <br /> • GIS Map of 13296 Mississippi Road <br /> • Heritage Park Utility Plan <br /> • City of Elk River Watermain Design Standards—Section 3400 <br /> I P O W E F I E D II <br /> Page 2 of 2 NATURE <br /> Reliable Public <br /> Power Provider P O W E R E D T o S E R V E <br /> 154 <br />