Laserfiche WebLink
City of Elk River <br /> Jackson Street Water Tower Condition Assessment July 1,2015 <br /> CDG Project#15010.00 <br /> OBSERVATIONS REFERENCE PHOTO <br /> 32. Some minor rusting <br /> and weathered <br /> paint were <br /> observed on the <br /> vertical tube. <br /> 33. The vertical tube is <br /> bolted into a <br /> concrete pad. The <br /> surfaces of the bolts 1 <br /> are covered with ''_'_�'►� <br /> rust and dirt, but are - <br /> performing well. _ <br /> �y 4! <br /> 19 COP <br /> COLLABORATIVE DesignGroup,inc. <br />