My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. BASR 07-24-2001
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Board of Adjustments
>
BOA Packets
>
2000-2009
>
2001
>
07-24-2001
>
4.1. BASR 07-24-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 10:36:12 AM
Creation date
7/23/2015 10:36:10 AM
Metadata
Fields
Template:
City Government
type
BASR
date
7/24/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Wireless L.L.C. <br /> 426 N.Fairview Avenue Room 101 <br /> St.Paul,Minnesota 55104 <br /> • <br /> ride the light <br /> June 21,2001 Qvve S t.. <br /> Planning Commission <br /> City of Elk River <br /> Minnesota <br /> Re: Coverage and capacity study for Qwest Wireless site MIN 466 located at 21475 Hwy <br /> 169, Elk River, MN 55330 <br /> Dear Members, <br /> Qwest Wireless operates a Personal Communications System (PCS) in the Minneapolis—St. <br /> Paul greater metropolitan area. When choosing an appropriate location for a cell site, we try to <br /> meet both the coverage and capacity objectives we want to achieve in that particular service <br /> area. For cell sites located in highly residential and commercial areas, our objective as a PCS <br /> provider is to provide good in-building service and wireless data service to as many businesses <br /> and homes as possible. During this process, the RF design engineer must balance signal level <br /> requirements of the area with capacity limitations of the system while incorporating his <br /> knowledge of the terrain and the density of surrounding clutters. <br /> In order to meet the requirements of continuous coverage and fill in our footprint in the north of <br /> the Minneapolis—St. Paul greater metropolitan area, particularly along Hwy 169 and we are <br /> proposing a 150' site at the 21475 Hwy 169, Elk River. <br /> During our search for a location for the proposed cell site, we also evaluated other locations in <br /> the area, but unfortunately they did not work out. <br /> - The Burlington Northern Tower to the south west of the proposed location was looked in as <br /> a possible location but the Tower was interfering with the existing sites in the Elk River area. <br /> Please feel free to contact me directly at 651 642 6357 if you have any questions. <br /> Sincerely, <br /> 1 <br /> RF Design Engineer <br /> Manish R Vaishnav <br /> • <br /> EXHIBIT B <br />
The URL can be used to link to this page
Your browser does not support the video tag.