My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. BASR 07-24-2001
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Board of Adjustments
>
BOA Packets
>
2000-2009
>
2001
>
07-24-2001
>
4.1. BASR 07-24-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 10:36:12 AM
Creation date
7/23/2015 10:36:10 AM
Metadata
Fields
Template:
City Government
type
BASR
date
7/24/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• to the south. This existing tower site was tested and was <br /> determined to not work by a professional RF Engineer. (See <br /> Exhibit B) <br /> The wind generator site located on 225th Avenue NW was also <br /> reviewed by an RF Engineer and was determined not to work <br /> for the purposes of cellular communications due to the rotating <br /> blades,which would interfere with the signal. <br /> Loucks Associates on behalf of Qwest Wireless has done due <br /> diligence over the past year to find a site which works both <br /> from a community planning perspective and radio frequency <br /> feasibility perspective. The proposed new site is the only <br /> available site in the search ring that is high enough to provide <br /> adequate service to the coverage area while minimizing tower <br /> height and conspicuousness. <br /> ii . Any proposed wireless telecommunication service <br /> tower shall be designed, structurally, electrically <br /> and in all respects constructed, to accommodate both <br /> the applicant' s antennas and comparable antennas for <br /> at least two additional users if the tower is over 100 <br /> feet in height or for at least one additional user if <br /> the tower is more over 60 feet in height. Towers must <br /> be designed to allow for future arrangement of <br /> antennas upon the tower and to accept antennas mounted <br /> at varying heights. <br /> The proposed tower will meet this requirement. It will be designed to <br /> accommodate at least two additional users.(See Exhibit E) <br /> E. Construction Requirements. All antennas erected, <br /> constructed, or located within the City shall comply with <br /> the following requirements: <br /> i. All applicable provisions of this code. <br /> ii . Towers and their antennas shall be certified by a <br /> qualified and licensed professional engineer to <br /> conform to the latest structural standards and wind <br /> loading requirements of the Uniform Building Code and <br /> the Electronics Industry Association and all other <br /> applicable reviewing agencies. <br /> iii . With the exception of necessary electric and <br /> telephone service and connection lines approved by the <br /> City, no part of any antenna or tower nor any lines, <br /> cable, equipment or wire or braces in connection with <br /> either shall at any time extend across or over any <br />
The URL can be used to link to this page
Your browser does not support the video tag.