Laserfiche WebLink
• The water operators have started with the scheduled annual hydrant maintenance. This <br /> year the total number that will be receiving preventative maintenance will be 363 <br /> hydrants; this includes 163 private hydrants and 200 utility owned hydrants. <br /> • The water operators exercised and performed preventative maintenance on all of the gate <br /> valves that were located in the 2015 street improvement areas. This helps to ensure that <br /> the valves are in working order before the street project begins. If there were to be any <br /> gate valves requiring replacement, we would be able to complete that before the road is <br /> replaced. We did locate one valve on County Road One/Proctor Ave that will be repaired <br /> during the county's reconstruction project. During this inspection,we take gate valve ties, <br /> which help us relocate valves should they be paved over. <br /> • We had our ERMU Field Services Space Needs Study Kickoff meeting with Kodet <br /> Architectural Group on July 8. As we get further into the study, we will continue to keep <br /> the commission updated on our progress. <br /> ATTACHMENT: <br /> • June Pumping By Well <br /> 11' 011E11E0 BY <br /> Page 2 of 2 NATURE <br /> 0 <br /> Reliable Public <br /> Power Provider P O W E R E D T O S E R V E <br /> 65 <br />