My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1 EDSR 07-20-2015
ElkRiver
>
City Government
>
Boards and Commissions
>
Economic Development Authority
>
EDA Packets
>
2014-2020
>
2015
>
07-20-2015
>
6.1 EDSR 07-20-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2015 11:09:57 AM
Creation date
7/16/2015 11:09:53 AM
Metadata
Fields
Template:
City Government
type
EDSR
date
7/20/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
This project will strengthen the local economy through increased tax base,the retention of over 200 <br /> well-paying jobs, and the creation of a minimum of 72 new FTE by the end of 2017 between the two <br /> buildings. This does not include any additional employees hired with the planned acquisition(as <br /> described below) in 2016. <br /> Currently,Sportech contributes over$320,000 annually in property taxes between the two buildings. <br /> Preliminary tax estimates anticipate the new facility will generate a minimum of$216,383 in taxes per <br /> year. Upon project completion, its current headquarters,and new building (excluding proposed <br /> expansion), will contribute an estimated $330,000 per year in property tax base revenue for Minnesota. <br /> Based upon an economic impact study conducted by third-party firm CTG Research,the project will <br /> result in the following: <br /> • Create 113 indirect and induced jobs throughout the local economy,which will pay$38,757 in <br /> average annual salary,or$18.63 per hour <br /> • Increase consumer expenditures by$3,041,737 annually <br /> • Bring a total of 60 residents to Elk River <br /> • Bring a total of 151 residents to Sherburne County <br /> Combined with Sportech's existing employment of 204 FTE,total economic impact with the current <br /> facilities and proposed facilities is: <br /> • 549 direct, indirect and induced jobs <br /> • $11,659,991 in consumer expenditures annually <br /> • 230 residents in Elk River <br /> • 581 residents in Sherburne County <br /> Description of Request-City <br /> Sportech is requesting abatement in the amount of$982,720 from the City over a 20 year term. <br /> Sportech has received a written letter from ISD 728 denying their abatement request, statutorily <br /> permitting them to apply for a 20 year term. This amount was based upon the estimated valuation of <br /> the 105,000 sq.ft.facility provided by Sherburne County. Since December of 2014,Sportech has been <br /> working with city staff and the EDA on discussions to purchase the two lots in NEBC. During this <br /> process,we ran into several roadblocks,which caused us to explore options in surrounding <br /> communities. Luckily, with the help of Economic Development Director Amanda Othoudt and other <br /> elected officials,Sportech was able to reach an agreement which allows the company to remain in Elk <br /> River,and continue their aggressive growth trajectory. <br /> As indicated prior,Sportech is in the process of an acquisition(to be complete in 2016),which will result <br /> in an additional 73,500 sq.ft. expansion,expected to be completed in 2018. Per the county assessor, <br /> once the expansion is complete,the property is expected to generate$320,376/year in property taxes, <br /> broke out as follows: <br />
The URL can be used to link to this page
Your browser does not support the video tag.