My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1 EDSR 07-20-2015
ElkRiver
>
City Government
>
Boards and Commissions
>
Economic Development Authority
>
EDA Packets
>
2014-2020
>
2015
>
07-20-2015
>
6.1 EDSR 07-20-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2015 11:09:57 AM
Creation date
7/16/2015 11:09:53 AM
Metadata
Fields
Template:
City Government
type
EDSR
date
7/20/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Springsted Incorporated <br /> 380 Jackson Street, Suite 300 <br /> Saint Paul,MN 55101-2887 <br /> Springsted <br /> Tel: 651-223-3000 <br /> Fax: 651-223-3002 <br /> www.springsted.com <br /> DRAFT MEMORANDUM <br /> TO: Amanda Othoudt, Economic Development Director <br /> FROM: Mikaela Huot,Vice President/Consultant <br /> DATE: June 23,2015 <br /> SUBJECT: Envision Co., LLC(Sportech)Proposed Tax Abatement—Project Analysis <br /> The City of Elk River has asked Springsted to evaluate a tax abatement request for assistance submitted by the <br /> developer, Envision Co., LLC(Sportech).The developer proposes to purchase land from the Economic Development <br /> Authority of the City located within the 2^d phase of the Nature's Edge Business Center and construct an approximate <br /> 105,000 square foot facility to be used to assemble cab systems and parts for vehicle OEMS. There are plans for a <br /> potential future expansion of an additional 73,500 square feet that is not currently included within this analysis. The <br /> company is purchasing land from the City for a total purchase price of$1,288,590. The company currently employs <br /> 204 FTE and plans to create an additional 72 new FTE by the end of 2017. According to the applicant, the tax <br /> abatement assistance will be used as annual cash flow to support debt service on the approximate$9.7M project to <br /> be financed with a combination of debt and equity. <br /> The purpose of this memo is to summarize the analysis that Springsted prepared, including the estimate of tax <br /> abatement revenues for the project and to assist with determining whether the project as proposed is likely to <br /> proceed "but for" the requested tax abatement assistance. The analysis is based on our review of the project <br /> components and financials and general rationale for assistance as submitted by the developer. <br /> There are several methods available to determine if a project would proceed "but for" the assistance. An analysis <br /> comparing the rates of return with and without assistance is a common method used to analyze the "but for" test. <br /> However, in some cases,a review of the project's sources and uses of funds and operating cash flow performance is <br /> done to determine if an operating gap exists or if the project performance is not expected to meet minimum financing <br /> requirements and return thresholds to assist with determining that a project meets the"but for"test. If,following the <br /> review, it is determined that the project has a shortage of debt, cash, and/or equity based on the projected value of <br /> the project upon completion and net operating income available to support debt service, it can be determined that the <br /> Public Sector Advisors <br />
The URL can be used to link to this page
Your browser does not support the video tag.