Laserfiche WebLink
City of Elk River <br /> Jackson Street Water Tower Condition Assessment July 1,2015 <br /> CDG Project#15010.00 <br /> OBSERVATIONS REFERENCE PHOTO <br /> 6. The inside of the <br /> base of each leg <br /> has been filled with <br /> concrete. <br /> 7. The sloped surface <br /> of the concrete <br /> allows water to <br /> drain from the base <br /> of the legs, but <br /> water that flows to <br /> sides of the legs has <br /> begun to rust and deteriorate the . � <br /> steel. <br /> 6 COLLABORATIVE ►esignGroup,inc. <br />