Laserfiche WebLink
REOUREMEM4 OF THE OEM —1 NTIHOe2ATION TO DISRMGE <br />STORM WATER ASSCOATCO MTH LONSTMIOnON ACTIVITY DRIER ME <br />NATIONAL POLLUTANT DIS"IRGE ELMNATION SYSTEM (HP.D.ES) / STATE <br />DISPOSAL SYSTEM (SUS) PERMIT PROGRAM OVER TAKE PRECEDENCE O ME <br />PLANS AND THESE NOTES <br />• TIE PCWMEM STORYWATER MANAGEMENT SYSTEM ME ME PROPOSED <br />NILMATION AREAS <br />FILL NAVE RESPONSIBILITY FOR LONG <br />• TERM OPERATION AND MNNTENMEE OF ME PEAMNNENT STORY <br />NATER MANAGEMENT SYSTEM. <br />BILL HAVE BESPONSWIL FOR IMPUMENTATION <br />• OP THE SWPPP BEFORE AND DUNHG CONSTRUCTION. <br />• ME CONTRACTOR SHAD PROVIDE THE OWIIER MM A CHAD OF <br />RESPONSBLII MM ALL OPERATORS ON SITE To ENSRE THAT <br />THE SWPPP MLL BE IMPLEMENTED M FOLLOWS <br />MIMING CONTRACTOR: <br />BIlSNE55 MANE <br />CONTACT PERSON TELEPHONE NCLIAE AREA <br />STREETS d U TT%S CONTRACT.: <br />NNNE55 LAME <br />CONTACT PERSON TELEPHONE INCLUDE MCA CODE <br />• THE CONTRACTOR SHALL FOLLON ME IMPLEMFM— BEOIIENCE <br />M SIARN ON THIS SUET. <br />• CONTRACTOR TO ADHERE TO ALL REOIIR OME TS R THE MINNESOTA <br />POLLUTION OOHTNOL AGENCY N.P.O.ES PERMIT. NULgNG ME <br />KOUIREMENT TO MUM ME AREA DISTURBED BY GRADING AT MY <br />GIM TIME AND TO COMPLETE TURF RLSTRATION MMN THE TIME <br />REOUAED BY THE PERMIT AFTER CWPLETON OF GRADING OF AN AREA. <br />• ALL BEST MANAGEMENT PRMTIOES (W SELECTED SHAL L BE <br />APNMPMATE FOR THE TIME OF YEAR. CONDITIONS. AND ESTIMATED <br />OIIX,VTION OF USE. <br />• A CRY OF TNESE PLANS MUST BE ON THE JOB SITE MHENEVR <br />CONSTRUCTION IS IN PROGRESS. <br />• <br />THE CONTRACTOR SHALL IMPLEMENT CONSTRICTION PHASIC, <br />VEGETATIVE BLFFR STRIPS HORIZONTAL SLOPE RIQNO AND OTHER <br />CONSTRUCTION RAOnCES THAT MNIMUE EROM.. THE LOCATRnN D <br />AREAS NOT TO BE DISTURBED MUST BE DELINEATED (E.G. MTH FLAGS, <br />STAKES. SONS SILT PENCE. ETC.) ON ME OEVFLRNENT SITE BEFORE <br />ANON SONS <br />• ALL EIP09CO SOIL AREAS WIMM 200 FEET R A SRFAM WATER R <br />MY STORIIWATR CWYEYANCE SYSTEM MACH IS CONNECTED TO A <br />SNFACE MAT EA MIST RE STANLIMO MTM T DAYS (SERER MAN <br />Y I SLI 14 PAYS (b:1 TO I I SLOES), ON 21 DAYS (FLATTEN <br />MM Iw THESE AREAS IH0.WE POND SIDE SUOPES EN•OBED SOIL <br />AREAS WITH A POSTIYE SLOPE TO A CURB AND OGUTTR SYSTEM. STORM <br />SEWER INLET. RAMAO DRR, R OTHER SYSTEM THAT DISCHARGES TO <br />A SRFADE WATER. <br />• THE HRAAL NETTED PERIMETER R MY RAINAK QTR MIST BE <br />STADIUM MTHIM 200 LINEAL FEET FROM THE PROPERTY EDGE, R <br />TRW THE POINT OF DISOH_ TO ANY SRFAD WATER (WITHIN 24 <br />HOURS OF COMNECTNG TO A SURFACE WATER). <br />• PITH OIITIETS MUST BE PROVIDED MTH TEM, R PERMANENT ENEWOY <br />DISSIPATION MMN 24 HORS GE DONNECTION TO A SRFAM WATER. <br />• SEDIMENT CONTPOL PRACTICE MI- MMMOE SEDIMENT E.T.R. <br />SURFACE WATERS ETCHES AND SEDIMENT BASINS REQUIRE MOUNT <br />CONTA0. PRACTDES ONLY AS APPROPRIATE FOR SITE CONDITIONS IF <br />DONIN GRADE SYSTEM IS OVERLOARED, ADDITIONAL UPGRADE PRACTICES <br />MBT BE INSTALLED, AND ME SWPPP MIBT BE ANENDED, THERE <br />SHALL BE NO UNBROKEN SLOPE LENGTH OF GREATER THAN 75 FEET <br />FOR SLOPE MTH A RAD OF S I R STEEPER. SLOPES MAY BE <br />Bfldfd MM BLT PENCE, ROC( ONE. DAMS, CWPRT SAM M R <br />OTTER APPROVED METHODS MD/OR AS SHOW ON THE EROSION <br />CONTROL PLAN. <br />• SEDIMENT CONTROL PRACTICES MST BE ESTABUWED ON DOWNGRADE <br />PERIMETERS BEFORE IFGRAE LAND DISTURBING ACTIVITIES BEGIN. <br />• ME TIMING OF MOMENT CONTROL PRACTICES MAY BE ADJUSTED TO <br />ACWWODATE SHORT TERM A VITIE HOWEVER THESE PRACTICES <br />MDT BE INSTALLED BEFORE ME NEXT PRECIPITATION EVENT EVEN IF <br />ME ACTIVITY IS NOT DONPLETE <br />• CR Olt MGT PROTEDT ALL STORM DRAIN INLETS BY APPROPRIATE <br />BITS OGNHG DONSrNDTIW UMTIL NL SMRGES WUN POTdnAL FDR <br />DISONARGNG TO ME INLET HAVE BEEN STAND D. <br />• TEMPORARY STORRLES MIST HAVE SILT FENDE AROUND ME <br />PFAMETR OP THE BME OP THE STOONNLE AND CMNOT BE PLACED IN <br />SRFADE WATERS, INCLUDING STORM WATER CDIMYMCES SUCH AS <br />CURB AND GUTTER SYSTEMS R CONDUITS R UTWES <br />CNI 48 HWre" Glgping <br />GOPHER STATE ONE CALL <br />TWin CAM AT.O 651 -454 -0002 <br />MN. Toll free I -BOD -252 -1166 <br />• VEHIQ.E TRACANG MUST BE MMY3ED BY BYP'S STREET SWEENNi <br />MUST BE USED IT SAN NAP'S ARC NOT ADEOUATE TO PREVENT <br />SEDIMENT FROM BEND TRACKED ONTO THE STREET. <br />• CONTRACTOR MUST NSTALL TEMPdiMY (dt PERMANETIT) <br />WORIENTATIEN BARNS MYTH TEN OR YORE AORE OF dSTIRBED SOM1 <br />RAM TO A CNIMON LOCATION MD/CR AS VOW ON ME RoBON <br />CONTROL PLAN. <br />• D IATERIN: OR MY TYPE OF S BI DRNNAK MAT IMY NAVE <br />TLRND NI 4DIMENT LADEN DISONARGE WATER MST BE DISOIARCCO 10 <br />A SEDIMENT NASN ON TINE PROJECT SITE MI"C" POSSBE IF TINE <br />WATER CANNOT BE DISONARKII TO A BASIN RYAN TO ENTERING ME <br />SURFACE WATER, IT MST BE TRCATCO MM ME APPARRMTE ;'S <br />SXN MAT THE I—ARGE DOES NOT ADVRSELY AFFECT ME <br />RECEIVING WATER OR DONNSTRGY LMDON ER1 ME CONTRACTOR <br />MIST ENSURE MAT DIS HARK POINTS ARE ADEQUATELY PROTECTED <br />TRW EROSION AND SCOUR. ME DISCHARGE MINT BE DIlERBED OVER <br />NATUR AL ROOK RIPNM. BATA BADS. PLASTIC SHEETING. OR OTHER <br />N)IPTED ENERGY DISSIPATION MEASRES. <br />• ALL WATER FROM DEWATENNO MUST BE DISONARGD IN A MANNER THAT <br />006 NM C NUISANCE CONDITIONS, CAISSON, N <br />ON, ON INUNDATION OF <br />WTLANDS CAIRANG SONNCMT ADVERB: IMPACT TO ME WETLAND. <br />• THE CONTMCTOR MUST APPOINT SOMEONE TO NSPCM THE <br />CONSTRDOTION STE ONCE EVERY SEVEN DAYS DURING ACTIVE <br />CONSTXUCDW AND YA NN 24 NOIRS AFTER A RAINFALL EYENT OF <br />GEATER MAN d5 IN N 24 HOUR. ALL INSPECTNRS MUST BE <br />RECCROED IN MIMS AND RETAINED PER M.P.CA. NPD.LS. <br />BEGAIREENTS (NOTE: LOCK ANSDICTON MAY BEQWE MOBE <br />FREO.ENT NTERVK OF INSPECTION.) <br />• <br />SOLID WASTE MGT BE DISPOSED OF PER M.P.C.A REOMREYENTS. <br />HAZARDOUS MAIENALS MINT BE STORED AND DISPOSED OF PER M.P.CA <br />• REGAATNMS. <br />• OTTENNAL NASH- OF OONSTRUCIION VEHICLES MIST BE UNITED To A <br />DEEMED NEA OF THE STE. RUROE MUST BE CONTAINED AND WMTE <br />PNOPRLY DISPOSED OF. NO ENONE DEOEASNG E ALLOWED ON STE. <br />• <br />THE PERMITEE (THE OWER/DEVOOPR AND THE CONTRACTOR -0 <br />SOPS ME YPOA NPDE/S)S APPLICATION FOR CORK STOUT -WATER <br />PERIT FOR CONSTNICTION ACTINi CAST ENSURE FINK STABLRATION <br />DA THE SIRE A NOTICE OP TERMINA MUST BE SIBMTTCO WTINN b <br />DAYS OF RINK SrANUUn ". <br />• FINK STABWZAW N CAN BE ACIEVED IN ONE OF THE FOLLOWING <br />WAYS <br />I.) ALL BILL DISTURBING ACTIVITIES NAVE BEEN UNIFORM AUTO MARE <br />MAN TOR R THE BIRFADE STABLLI4D MTH VNIFOIM PERENNIAL <br />VEGETATIVE COVEN AGO: <br />A. LL DITCHES ME SIABUIIU <br />B. ALL EROSION EMP'S (SUET AS SILT FENCE) MBT BE <br />C. ALL MOMENT HAS BEEN cLEArEO OUT FRaM DONVEYANDEs <br />AND SEDIMENTATION BASINS THAT NE TO BE USED AS <br />PERMANENT BASINS THE CEEANOUT R PEIRNANRT BASINS <br />MUST BE BEHOENT TO RETURN ME BASIN TO DESK <br />CAPACITY. <br />2) i0R BESDENTIK CONSTRUCTION, TEMPORARY ROSON PROTECT"" <br />AND DONMRADE PEflIMETR CONTROL FOR INDINDIAL LOTS MUST <br />BE COWIETED AN D THE RESIDENCE HAS BEEN TRANSFERRED TD <br />THE HOMEOMNER. ADNMNALLY. THE PEMBTTEE MUST DISTRIBUTE <br />THE NPOA •HGAEOIINR FACISEET' TO THE HWEOM'NEiR. <br />TRANBFEN EF IHPEtIBlLITY FOR 81AIPPP <br />• <br />FROM SITE GRATING CONTRACTOR TO SiRBET AND UTILITY _TNACTON: <br />fOLOMNo SITE RIDING COMPLETION, WEN ALL EROSION WNTROL <br />MEASURES HAYS BEEN INSTALLED BY ME SITE GRADING DONTRACTR <br />AS REQUIRED AND ARE IN MORNING ORDER MTHOUT NEED D <br />MANTION AND ALL MEASURES HAVE BEEN REVEWED AND ACCEPTED <br />BY THE SKEET AND UTILITY CONTRACTOR, EXCEPT FR TU" <br />B6TRATI R WICK MUST DEMONSTRATE THAT R IS VIABLY "OUTING <br />THEN THE STREET AND UTLTY CONTRACTOR WILL EIECUTE M MKA <br />'APPLICATION FDR —11 TRANSFOR/MOCMICAnR FORM' (AVAILABLE <br />ON -LINE AT `w— PoA.STATEMNUs) FOR THE TRIO sFENEN E OF <br />PF�ONSBIIITY "DEN ME ONIGNAL NOTES PERMIT I— FOR ME <br />PRO.ELT. <br />GEOTEITILE FILTER ­1 <br />R—FILL <br />c wa D \ <br />C. nx x / e <br />� Eue4xNIExT <br />EROSION CONTROL SILT FENCE h C.B. PROTECTION <br />• FOR DISOHAMGS TO SPECIAL WATERS OR WETLANDS. BEQNDIENTS OF ME <br />GENERAL PEWIT AUTHRILATIOH TO MSCHAYRGE STORM WATER ASSOdATED <br />MTH WHSTRUCi1QN ACTIVITY UNDER THE N.P.D.ES/ST TE DISPOSAL <br />SYSTEM PERMIT PROGRAM APPENd% A MCIT BE FOLLOWED. <br />• OPERATE TR EOUPNENT (DOZER UP AND DOW E)POBEO SDIL <br />SLOPES ON FlNK PA53, LEAVING Am GROOVES PERIPENDICIAM TO <br />THE SLOPE. DD NOT BAR -BLADE, LEAVE A SURFACE ROUGH TO <br />MINIMIZE EROSION. <br />• A11 TAE6 NOT LISTED FDR REMOVAL SHHKL BE PROTECTCO. DO NOT <br />OPERATE DOCA ENT MTHIN THE DNPLIW. ROOT ZONES ON WITHIN TREE <br />PROTECTXN FENCE APFAS <br />• NNEREVER POSSIBLE. PRESERVE ME FISTING TREES GRASS AND —A <br />VEGETATIVE COVER TO HELP HATER RUNOFF. <br />• ESTABLISH A PERMANENT VEGETATIVE COVER OVEN AL EXPOSED SOILS <br />WIIEA[ LAND IS COMING DINT OF AGBLT.LTHIRK PRODUCTION. PLANT AS <br />SOW AS POSSIBLE TO ESTABLISH DENSE GRASS FILTER PRIOR TO <br />coNs nDIN AND TO MNMZC WEED ONOTRH. <br />• BLIP'S REFER TO EROSION AND SEDIMENT CONTROL PRACTICES DARED <br />IN ME MPCA PROTECTING WATER QAUTY IN URBAN AREAS AND THE <br />MINNESOTA CONSTROCTIDN SITE EROSION AND SEDIMENT CONTRD <br />PLANING HANDBOOK. <br />• KL EROSION AMI SEGMENT CONTROL FAOUTI6 EBW51 STALL BE <br />INSTALLED AND N OPERATION PRIOR TO LAND DISTURBANCE ACTIVITIES <br />SOME EROSON CONTROLS SUCH AS CHECK DAMS AND TEMPORARY <br />SILT PONDS YAY SE ­LED AS GRADING ODE RS N THE <br />SPECIFIC AREA THEY WALL BE MAINTAINED UNTIL OON `,N <br />IS OOMPIETED AND ME POTENTIAL FOR EROSON HAS PASSED. <br />•THE NIP'S SAWN ON ME PLANS ARE THE MINIMUM BEOUIPEM2NT5 FOR <br />THE ANTICIPATED SITE OOMITIONS. AS CONSTRUCTION PRDGESBES <br />AUTO UMFI I - ON SEASONAL CONDIMNB DICTATE, THE PERMITTEE <br />SHALL ANTIdPATE THAT MORE EMP% WILL BE NECESSARY TO ME <br />EROSION AND SEDIMENT CONTROL ON ME SITE OUING THE CQRSE <br />OF CONSTRUCTION, IT IS ME RESPONSIBILITY OF THE PENNTTEE TO <br />ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY <br />CONSTAUC110N ACTINT6 AND/OR CUM­ EVENTS AND TO PROVIDE <br />ADOITIONAL WPS OVER AND ABOVE ME MINMM KOIIIERAENYS SHOWN <br />ON THE PLANS THAT MAY K HEIDCO TO PROVIDE EFFECTIVE <br />PROTECTION OF WATER AND SOIL A60UtGE5. <br />• SLOPES AT S:I ON STEEPER, AND/OR WERE INDICATED ON THE PLANS <br />SHALL BE SEEDED AND HAVE AN EROSION OONRRIL BLNRET TYPE S <br />INSTALLED OR MAY K HYDROMICHED MM TAG(ER NYLON. <br />• ALL CONSTRUCTION ENTRANCES SNAIL K SURFACED MTH WASHED ROCK <br />ACROSS FULL MOTH FROM ENTRANCE POINT TO 5O FEET INTO THE <br />• INSTAL PERIMETER SILT FEND AROUND THE DEVELOPMENT ON ALL <br />DOW GRADIENTS AND AROMD ALL KTLAMS PRIOR TO ANY <br />CWSTRUCTIW. <br />• TEMPORARY SEED SHALL BE MNDOT Y% ISO • W WS PER AE RE R <br />APPROVED EQUAL <br />Al— SMALL BE MNDOT TYPE I (CLEAN PAT STRIA O 2 TONS PER <br />TCBE AND DISK ... IN PLACE R APPROVCO QUAL. INSTALLED <br />O MINIMUM BGL COVERAGE R THE SERFAGE AREA dSTURBEO. <br />• PERMANENT TURF RESTORATION IS SECOND IN ACCORDANCE MTH MNDOT <br />SBTe. SEED 3 MIXTIRE HBO AT SO POURS PER ARE, TYPE I M1.OH AT <br />MN COVERAGE MM DISC ANRR. WETLAND —B IS AIHDOT AK- <br />25B AT DO PONDS PER ARE. UPLAND BUFFER IS WOOT W AT M PQUNDS <br />PER ARE, MTH FAIR BLANKET. (INSTALL ONLY WERE GROIND IS <br />DISTLINFB4 ALL SEEDED AREAS ARE TO RECEW TYPE I MULCH AND DISC <br />MCNOR EROSION CONTROL BLANKET TYPE 3 R NYRDSECOCO MTH <br />TARFlER MULCH. <br />• IMMEDIA LL <br />TELY FOOM R R <br />NQ STE RIDING OPERATIONS AND PN TO THE <br />INSTALLATION GE UTILITIES, THE ENTIRE SITE (EXCEPT AOADWAYS) SHILL <br />HAYS BEEN SEEDED AND MU.CHED AND SENT DE SHALL HHAVE BEEN <br />INSTALLED AROUND ALL PONDS <br />• ALL TEMPORARY EROSION AND 9EDMEM CONTROL MEASURES SHALL BE <br />PROPERLY DISPOSCO OF WITHIN THIRTY (30) DAYS Ai'fOt FMK 9TE <br />STABUZAMIN IS AREVED R AFTER ME T DAPRMY NEASAR ABE <br />NO LONGER NEEDED. <br />e mu.Im„m <br />G•otnue SPapomla <br />sm <br />OLMOT ADOWEMKAID <br />OGGGEANHE <br />f2N AMDL ANHESDA S6SA EII Nwl AN SS.iTO <br />cgYT _ PE mvdrn Lvw CASIFRL Ls <br />DEVELOPAENT SUMMARY <br />TO,K PAAOD. AREA 4JQel8 SWFL M0 A. <br />TOTAL DISTRNED MCA . ACRES <br />TI <br />TOTAL AREA FOR TURF RESTOR ON • _ ACRES <br />EXISTING IMFR— AREA _ AI= <br />REM MPFRVIOUS AREA ACRES <br />I. INSTIL STAU,_ —SFALCI- ENFRAADE <br />2. INSTALL PERIMETER SEDIMENT CONTROL DICES (SILT <br />FENCE) <br />3. CONSTRUCT STCRMWATER NM.ATION AREAS <br />4. STOC PILE TOPSdL FOR RE -USE <br />S. COMPLETE STE RIDING <br />I <br />. STMROE DEHIAED MFRS AND $TOO(NLE WITIN <br />iNMANE USTED IN ROSKN PREVENTION PRAOTIDES <br />T. RM INSTALL MUMS. STOW SEWER STORM DRAIN INLET <br />PROTECTION, CON B CURTER M PAVING <br />B. WIZEN ALL CONSINDTON ACTIVITY IS CWPLEIE AND <br />THE SITE STANU2ED, REMOVE ACCUMULATED SEDIMENT <br />FROM NRLTRATION AREAS. REMOVE SEGMENT CONTROL <br />BMP'S. AND RESEED ANY AREAS DISTURBED BY TIER <br />REMOVAL <br />ELK LAVER <br />DD-1- IATI <br />R ID Y <br />R 0 _ P O cVRR Box <br />I. - eta ", k cmnectN O <br />2. Tne <br />2. R....•....e.,al .m e•eTH rv.., m. ­t-I. <br />INLET PROTECTION - <br />WIMCO (MODEL CG23) OR APPROVED EQUAL <br />d�EESO rc <br />`_SBSWP BP, o <br />e= <br />2 <br />•L <br />U a <br />J <br />O Z <br />N 'J <br />Cr <br />CL <br />~ F <br />U <br />En Z O <br />O d a <br />1- <br />0 SO o <br />2 U <br />Z <br />0 2 0 <br />0 D. <br />Ln <br />V 1 w <br />2 a <br />Lb 3 <br />O <br />N <br />e/ G 5 <br />