Laserfiche WebLink
City of <br />Elk <br />River <br />To: <br />From: <br />Date: <br />Subject: <br />Memorandum <br />Planning Department <br />Brandon Wisner, Stormwater Coordinator <br />June 10, 2015 <br />Site Plan Review Meeting —June 5, 2015 <br />Case #'s OA 15 -06, LU 15 -03, ZC 15 -06, CU 15 -10 — ERX <br />1. A development plan is needed in accordance with requirements listed in Ordinance Sec. <br />78 -503. - Stormwater and urban runoff control. and Sec. 78 -504. - Post construction <br />stormwater management. Also, a NIIDs water quality report and soil borings showing the <br />ground water depth is needed. Three feet of separation between the bottom of any proposed <br />stormwater basin and ground water is required. <br />PWAIPP <br />.... . ............. <br />RPM <br />Pr <br />=f�xw� \ \DC 3 -ELKR\ Shared \Departments \Community Development \Planning \Case Files \CUP \CU 15 -10 ERX \Site Plan � <br />Memos \Stormwater Coordinator 6 -5 -15 Site Plan Review Memo.docx <br />- - - <br />. <br />PWAIPP <br />.... . ............. <br />RPM <br />Pr <br />=f�xw� \ \DC 3 -ELKR\ Shared \Departments \Community Development \Planning \Case Files \CUP \CU 15 -10 ERX \Site Plan � <br />Memos \Stormwater Coordinator 6 -5 -15 Site Plan Review Memo.docx <br />