My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.2. SR 07-06-2015
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2015
>
07-06-2015
>
8.2. SR 07-06-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2015 4:08:42 PM
Creation date
7/1/2015 3:46:43 PM
Metadata
Fields
Template:
City Government
type
SR
date
7/6/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BKBM EXPERIENCE <br /> Covington at Norman Pointe <br /> Bloomington,Minnesota <br /> BKBM provided civil and structural engineering for a six-story multi-family residential <br /> building with five-stories of wood framing on one-story of precast concrete and masonry Mr.Steve Dunbar <br /> located on an approximately 8.4 acres. The large interior plaza on the second level Dunbar Development Corporation <br /> necessitated early coordination with the precast concrete,as well as a detailed load plan. 5000 Glenwood Ave.,Suite 200 <br /> We were able to take advantage of repetitive floor layouts to efficiently design the wood Minneapolis,MN 55422 <br /> framing. We also utilized some steel framing where it was necessary to transfer loads at the <br /> lower levels. All structure was above grade due to poor soil conditions,which also required <br /> driven pile foundations. Geotechnical exploration indicated the presences of clayey organic 763-377-7090 <br /> soils on a portion of the site,with high ground water levels. The project stormwater Steve.dunbar@ivyprop.com <br /> management was governed by 9-Mile Creek Watershed District. To meet the requirements, <br /> two underground infiltration systems were designed. To reduce the size of the systems, <br /> partial treatment/rate control was achieved on the raised plaza green roof. Water from the <br /> high roofs would discharge onto the green roof,and infiltrate through the grass media,to <br /> the roof deck drains. <br /> Mississippi Gardens Entertain Center <br /> Brooklyn Park,Minnesota <br /> Mississippi Gardens was a 2.5 acre redevelopment project along West River Road in <br /> Brooklyn Park,adjacent to the Highway 610 Bridge and the Mississippi River.The existing Mr.Mark Duff ney <br /> site consists of a razed building that was a restaurant along with an asphalt paved parking Market Mechanical <br /> lot on both the east and west sides of West River Road. BKBM Proposed site redevelopment 8701 Wyoming Ave.N. <br /> that consisted of a new wedding facility and parking lot addition. The east foundation Brooklyn Park,MN 55445 <br /> line of the new building matched the east foundation line of the old building so that <br /> the structure did not encroach any closer to the Mississippi River than the previous <br /> building.Civil engineering design consisted of grading,drainage,utilities and stormwater 612-867-5904 <br /> management for the new facility.Design also included measures to minimize impact to the markduffney@msn.com <br /> Mississippi River bluff directly adjacent to the new building and parking lot. <br /> Herzl Jewish Camp <br /> Webster,Wisconsin <br /> BKBM provided civil and structural engineering for an overnight Jewish camp.The project <br /> consisted of structural design and master planning for 15 new rustic cabins for campers, Mr.John Gockel <br /> additions to the fine arts and art buildings and new bathrooms with showers. BKBM also Herzl Camp <br /> provided footing designs for some additional existing buildings that were moved and repair 7204 West 27th Street,Suite 226 <br /> of an existing deck. Civil design consisted of master planning of 13.5 acres of new trails, St.Louis Park,MN 55426 <br /> buildings,beach front and shoreline deck. Services also included routing of new water <br /> supply lines,well locations and new sanitary sewer and septic systems. BKBM also prepared <br /> both temporary construction and permanent erosion control and stormwater management 952-888-5362 <br /> plans for the facility. jrgockel@aol.com <br /> RIVERS EDGE COMMONS EXPANSION PROPOSAL 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.