Laserfiche WebLink
BKBM EXPERIENCE <br /> Covington at Norman Pointe <br /> Bloomington,Minnesota <br /> BKBM provided civil and structural engineering for a six-story multi-family residential <br /> building with five-stories of wood framing on one-story of precast concrete and masonry Mr.Steve Dunbar <br /> located on an approximately 8.4 acres. The large interior plaza on the second level Dunbar Development Corporation <br /> necessitated early coordination with the precast concrete,as well as a detailed load plan. 5000 Glenwood Ave.,Suite 200 <br /> We were able to take advantage of repetitive floor layouts to efficiently design the wood Minneapolis,MN 55422 <br /> framing. We also utilized some steel framing where it was necessary to transfer loads at the <br /> lower levels. All structure was above grade due to poor soil conditions,which also required <br /> driven pile foundations. Geotechnical exploration indicated the presences of clayey organic 763-377-7090 <br /> soils on a portion of the site,with high ground water levels. The project stormwater Steve.dunbar@ivyprop.com <br /> management was governed by 9-Mile Creek Watershed District. To meet the requirements, <br /> two underground infiltration systems were designed. To reduce the size of the systems, <br /> partial treatment/rate control was achieved on the raised plaza green roof. Water from the <br /> high roofs would discharge onto the green roof,and infiltrate through the grass media,to <br /> the roof deck drains. <br /> Mississippi Gardens Entertain Center <br /> Brooklyn Park,Minnesota <br /> Mississippi Gardens was a 2.5 acre redevelopment project along West River Road in <br /> Brooklyn Park,adjacent to the Highway 610 Bridge and the Mississippi River.The existing Mr.Mark Duff ney <br /> site consists of a razed building that was a restaurant along with an asphalt paved parking Market Mechanical <br /> lot on both the east and west sides of West River Road. BKBM Proposed site redevelopment 8701 Wyoming Ave.N. <br /> that consisted of a new wedding facility and parking lot addition. The east foundation Brooklyn Park,MN 55445 <br /> line of the new building matched the east foundation line of the old building so that <br /> the structure did not encroach any closer to the Mississippi River than the previous <br /> building.Civil engineering design consisted of grading,drainage,utilities and stormwater 612-867-5904 <br /> management for the new facility.Design also included measures to minimize impact to the markduffney@msn.com <br /> Mississippi River bluff directly adjacent to the new building and parking lot. <br /> Herzl Jewish Camp <br /> Webster,Wisconsin <br /> BKBM provided civil and structural engineering for an overnight Jewish camp.The project <br /> consisted of structural design and master planning for 15 new rustic cabins for campers, Mr.John Gockel <br /> additions to the fine arts and art buildings and new bathrooms with showers. BKBM also Herzl Camp <br /> provided footing designs for some additional existing buildings that were moved and repair 7204 West 27th Street,Suite 226 <br /> of an existing deck. Civil design consisted of master planning of 13.5 acres of new trails, St.Louis Park,MN 55426 <br /> buildings,beach front and shoreline deck. Services also included routing of new water <br /> supply lines,well locations and new sanitary sewer and septic systems. BKBM also prepared <br /> both temporary construction and permanent erosion control and stormwater management 952-888-5362 <br /> plans for the facility. jrgockel@aol.com <br /> RIVERS EDGE COMMONS EXPANSION PROPOSAL 25 <br />