Laserfiche WebLink
Mr. Scott Hadicker <br />May 11, 2000 <br />Page Two <br /> <br />The grading plan also shows two retaining walls, one behind Lots 74 through 77 <br />which appears to touch on the building footprint and also limits the amount of rear <br />yards behind these buildings. This area should be reviewed. The second one is in <br />the southeast corner of the plat and actually is shown within the CSAH 12 fight-of- <br />way. This may be a wall that was proposed to be constructed with the CSAH 12 <br />project. This needs to be made clear. If this is a wall proposed by the Developers, <br />it certainly should not be built within the right-of-way. Since the CSAH 12 project <br />has not been undertaken at this point, perhaps the grading plan should reflect a <br />solution in this area that does not require or that minimizes the retaining wall. <br /> <br />This entire plat of Trott Brook Farms is anticipated to be ultimately served by the <br />high pressure water system; therefore, every unit within this 5th Addition should <br />have a pressure reducing valve installed on its water service. <br /> <br />If you have any questions regarding these comments, please call. <br /> <br />Sincerely, <br /> <br />Howard R. Green Company <br />Terry J. Maurer, P.E. <br /> <br />tJM:tw <br /> <br />O:\PROJ',810630j\0240\ltr 5-10-11 Hadicker.doc <br /> Howard R, Green Company <br /> CONSULTING ENGINEERS <br /> <br /> <br />